My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STAGECOACH
>
2714
>
2800 - Aboveground Petroleum Storage Program
>
PR0528419
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:05:56 PM
Creation date
7/10/2019 10:46:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528419
PE
2832
FACILITY_ID
FA0014705
FACILITY_NAME
711 MATERIALS
STREET_NUMBER
2714
STREET_NAME
STAGECOACH
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
17334014
CURRENT_STATUS
01
SITE_LOCATION
2714 STAGECOACH RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
711 Materials, Inc. <br /> ALTA <br /> Spill Prevention, Control and Countermeasure Plan ENVIRONMENTAL <br /> 2.0 PLAN AMENDMENTS AND REVIEW <br /> 2.1 Amendments to SPCC Plan by Owner <br /> Ref:40 CFR 112.5 <br /> This SPCC Plan will be amended within six (6) months of a change in the facility design, <br /> construction, operation or maintenance occurs which materially affects the facility's potential <br /> for the discharge of oil into or upon the navigable waters of the United States or adjoining <br /> shorelines. An amendment will be prepared within six (6) months, and implemented as soon <br /> as possible, but not later than six (6) months following preparation of the amendment. <br /> Examples of non-technical amendments and technical amendments, which require <br /> Professional Engineer (PE) review and certification, are identified in the list below. <br /> Non-Technical Amendments <br /> • Examples of changes may include, but are not limited to, phone numbers, name <br /> changes, any non-technical text change(s) and any facility reconfiguration that <br /> facility management determines does not materially affect the facility's potential to <br /> discharge oil. <br /> • A PE does not certify non-technical amendments. <br /> Technical Amendments <br /> • A PE must certify technical amendments. <br /> • Examples of changes may include, but are not limited to, commissioning or <br /> decommissioning containers; replacement, reconstruction or movement of <br /> containers; replacement, reconstruction or installation of piping systems; <br /> construction or demolition that might alter secondary containment structures; <br /> changes of product or service; or addition/deletion of standard operation or <br /> maintenance procedures related to discharge prevention measures. It is the <br /> responsibility of the facility to determine and confirm with the regulatory authority <br /> as necessary, what constitutes a technical amendment. The preamble of the rule <br /> states that an amendment is required only "when there is a change that materially <br /> affects the facility's potential to discharge oil" (67 FR 47091). <br /> • An amendment made under this section will be prepared within six (6) months of <br /> the change and implemented as soon as possible but not later than six (6) months <br /> following preparation of the amendment. <br /> • Technical amendments affecting various pages within the SPCC Plan can be PE <br /> certified on those pages, certifying those amendments only and will be <br /> documented on the log form in Appendix A. <br /> Alta Environmental 2 <br /> BASR-19-8895 <br /> July 3, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.