My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STAGECOACH
>
2714
>
2800 - Aboveground Petroleum Storage Program
>
PR0528419
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:05:56 PM
Creation date
7/10/2019 10:46:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528419
PE
2832
FACILITY_ID
FA0014705
FACILITY_NAME
711 MATERIALS
STREET_NUMBER
2714
STREET_NAME
STAGECOACH
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
17334014
CURRENT_STATUS
01
SITE_LOCATION
2714 STAGECOACH RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
711 Materials, Inc. <br /> ALTA <br /> Spill Prevention, Control and Countermeasure Plan ENVIRONMENTAL <br /> 5.0 GENERAL FACILITY INFORMATION <br /> 5.1 Facility Information <br /> 711 Materials, Inc. <br /> Concrete Batch Plant No. 5 <br /> 2714 Stagecoach Road <br /> Stockton, CA 95215 <br /> (209) 521-9771 <br /> 5.2 Designated Person(s) Accountable for Oil Spill Controls and Prevention <br /> Ref:40 CFR 112.7(f)(2) <br /> The following person(s) are accountable for discharge prevention at the Facility and report <br /> to Facility management. <br /> Name Title Telephone <br /> Steven Case Facility Response O: (209) 943-4730 <br /> Coordinator C: (209) 247-0845 <br /> 5.3 Facility Description <br /> Ref:40 CFR 112.7(a)(3) <br /> The 711 Materials, Inc. Concrete Batch Plant No. 5 (Facility) is approximately 5.5 acres and <br /> is located in the Triangle Industrial Park off Mariposa Road east of Highway 99 in Stockton, <br /> CA. The site address is 2714 Stagecoach Road. The site is fully paved and includes a batch <br /> plant, a concrete recycling unit, truck washing facilities, an administrative/truck maintenance <br /> building, and stockpiles of aggregate. The Site Plan included in Appendix C of this SPCC <br /> Plan shows the location and layout of the Facility. It also shows the location of oil containers, <br /> buildings, loading/unloading and transfer areas, and critical spill control structures. <br /> The Facility is bounded by Duck Creek to the north, undeveloped industrial parcels to the <br /> east and west, and developed industrial sites to the south. All storm water is contained and <br /> directed to storm drain inlets or the concrete recycling unit. Except for Duck Creek, the site <br /> and adjacent sites are relatively flat and no storm water run-on from adjacent parcels is <br /> anticipated. All site storm water is routed through a Bay Saver® underground in-line <br /> stormwater treatment unit, which is cleaned regularly. <br /> The primary activity on the site is concrete batching and loading into cement mixing delivery <br /> trucks. The site contains a recycling unit that separates the aggregate from residual cement <br /> in the returning trucks, and recycle the water back into the concrete mixer. Truck <br /> maintenance is conducted indoors,with no exposure to storm water. Truck wash water drains <br /> to the recycling unit and steam cleaning is conducted under a canopy and drains to its own <br /> recycling unit. Refer to Section 6.0 for a detailed description of the oil storage containers <br /> located at the facility. <br /> 5.4 Portable Facilities <br /> Ref:40 CFR 112.3(c) <br /> 711 Materials, Inc. is not a portable operation and therefore Section 112.3(d) is not <br /> applicable. <br /> Alta Environmental 8 <br /> BASR-19-8895 <br /> July 3, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.