My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOFF
>
1515
>
2800 - Aboveground Petroleum Storage Program
>
PR0528646
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:16:18 PM
Creation date
7/10/2019 10:59:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528646
PE
2832
FACILITY_ID
FA0017929
FACILITY_NAME
SPEEDCO # 944
STREET_NUMBER
1515
STREET_NAME
HOFF
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
24534026
CURRENT_STATUS
01
SITE_LOCATION
1515 HOFF DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-h <br /> J" <br /> Spill Prevention,Control,and Countermeasure Plan <br /> Love's/Speedco#944,Ripon,California <br /> Page 11 of 13 anteagroup <br /> considered a "loading/unloading rack"; therefore, the loading/unloading rack requirements specified in 40 CFR <br /> §112.7(h)do not apply. <br /> The Facility contracts with various suppliers to fill the on-site tanks. The diesel and/or oil delivery trucks unload <br /> product by pumping it through a hose directly to the tank or a fill port. The fill points for the tanks are located <br /> adjacent to floor drains which drain to an oil/water separator. All supply and discharge valves on the tank are <br /> secured at the end of the business day. <br /> A Facility representative escorts the incoming truck driver and remains with the driver and truck until <br /> loading/unloading is completed. Loading/Unloading and spill prevention procedures are posted at all delivery and <br /> unloading areas. <br /> Prior to departure of a tank truck, the truck operator is responsible for inspecting the drains and all outlets on the <br /> tanker to assure that no leaks are observed.The Facility representative, along with the driver, inspects all surfaces <br /> to ensure no discharges have occurred.The receipt for delivery is not signed until all releases are cleaned. <br /> Removal of used motor oil from the various AST occurs as needed. The Facility contracts with a used oil service to <br /> clean the oil/water separator at least twice annually. <br /> Loading/Unloading procedures are provided in Appendix C and the guidelines will be followed during bulk fuel <br /> transfer operations. <br /> 4.18 Brittle Fracture Evaluation [40 CFR 112.7(i)] <br /> There are no field constructed tanks located at the Love's/Speedco #944 facility; therefore, the brittle fracture <br /> evaluation is not required under this section. <br /> 4.19 Conformance with State Requirements [40 CFR 112.7(j)] <br /> The facility will conform to all applicable state requirements for oil storage. State of California spill reporting <br /> requirements are discussed in Section 4.10. <br />
The URL can be used to link to this page
Your browser does not support the video tag.