Laserfiche WebLink
LOADING/UNLOADING PROCEDURES <br /> PRE-LOADING PROCEDURES: <br /> • Do not initiate loading or unloading during a storm event <br /> • Check the tank level at the start and finish of the loading/unloading operation. Verify that there <br /> is sufficient volume in the tank to accommodate the delivery. <br /> • Chock truck or trailer wheels <br /> • Check availability of absorbent materials <br /> • Unlock connection <br /> • Visually inspect unloading line,valves,and fittings <br /> • Check operation of safety shower(if available)and inform driver of location <br /> • Check driver's and own personal protective equipment(See MSDS for required equipment) <br /> POST-LOADING PROCEDURES: <br /> • Note any spillage of chemicals/fuel oil and notify appropriate personnel <br /> • Visually inspect unloading line,valves,and fittings <br /> • Relock connection <br /> • Remove any absorbent materials used during unloading operations <br /> • Remove chocks <br />