Laserfiche WebLink
0 <br /> Q <br /> ante6group <br /> Table of Contents <br /> PROFESSIONAL ENGINEER CERTIFICATION (40 CFR 112.3(D)(1))............................................................................i <br /> MANAGEMENT COMMITMENT(40 CFR 112.7(D)(2))............................................................................................ii <br /> PLAN 5-YEAR COMPLIANCE REVIEW[40 CFR 112.5(B)].........................................................................................iii <br /> 1.0 INTRODUCTION ...............................................................................................................................................1 <br /> 2.0 GENERAL FACILITY INFORMATION ..................................................................................................................1 <br /> 3.0 PLAN ADMINISTRATION ..................................................................................................................................2 <br /> 3.1 Plan Certification [40 CFR 112.3(d)and 40 CFR 112.5(c)]:....................................................................2 <br /> 3.2 Plan Availability(40 CFR 112.3(e)):.......................................................................................................2 <br /> 3.3 Plan Amendments(40 CFR 112.4,and 40 CFR 112.5(a)):......................................................................2 <br /> 3.4 Periodic Plan Review [40 CFR 112.5(b)]:...............................................................................................3 <br /> 4.0 GENERAL REQUIREMENTS...............................................................................................................................4 <br /> 4.1 Management Commitment(40 CFR 112.7):.........................................................................................4 <br /> 4.2 Conformance with Requirements and Deviations [40 CFR 112.7(a)(1)-(2)and 112.6(b)(4)]:..............4 <br /> 4.3 Description and Physical Layout of the Facility[40 CFR 112.7(a)(3)and 40 CFR 112.7(a)(3)(i)]: .........4 <br /> 4.4 Facility Oil Storage and Use [40 CFR 112.7(a)(3)(i)]..............................................................................5 <br /> 4.5 Discharge Prevention Measures [40 CFR 112.7(a)(3)(ii)]......................................................................6 <br /> 4.6 Discharge/Drainage Controls [40 CFR 112.7(a)(3)(iii)]..........................................................................6 <br /> 4.7 Countermeasures for Discharge Discovery, Response and Cleanup [40 CFR 112.7(a)(3)(iv)]..............7 <br /> 4.8 Methods of Disposal of Recovered Material [40 CFR 112.7(a)(3)(v)]...................................................7 <br /> 4.9 Contacts List and Phone Numbers [40 CFR 112.7(a)(3)(vi)]..................................................................7 <br /> 4.10 Discharge Discovery and Reporting Procedures [40 CFR 112.7(a)(4-5)]...............................................7 <br /> 4.11 Potential Spill Predictions of Direction, Rate of Flow,and Quantities [40 CFR 112.7(b)].....................8 <br /> 4.12 General Containment/Diversion Controls [40 CFR 112.7(c)]................................................................8 <br /> 4.13 Contingency Plan [40 CFR 112.7(d)] .....................................................................................................9 <br /> 4.14 Facility Inspections,Tests, and Records [40 CFR 112.7(e)]...................................................................9 <br /> 4.15 Personnel Training and Discharge Prevention Procedures [40 CFR 112.7(f)].....................................10 <br /> 4.16 Facility Security[40 CFR 112.7(g)] ......................................................................................................10 <br /> 4.17 Facility Loading/Unloading [40 CFR 112.7(h)] ....................................................................................10 <br /> 4.18 Brittle Fracture Evaluation [40 CFR 112.7(i)]......................................................................................11 <br /> 4.19 Conformance with State Requirements [40 CFR 112.7(j)]..................................................................11 <br /> 5.0 SPCC REQUIREMENTS FOR ONSHORE FACILITIES [40 CFR 112.8]..................................................................12 <br /> 5.1 Facility Drainage [40 CFR 112.8(b)].....................................................................................................12 <br /> 5.2 Bulk Storage Containers [40 CFR 112.8(c)].........................................................................................12 <br /> 5.3 Facility Transfer Operations, Pumping,and Facility Process [40 CFR 112.8(d)] .................................13 <br /> 5.4 Facility Response Plans(40 CFR 112.20).............................................................................................13 <br />