My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2800 - Aboveground Petroleum Storage Program
>
PR0529406
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 4:35:40 PM
Creation date
7/10/2019 11:11:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0529406
PE
2832
FACILITY_ID
FA0002818
FACILITY_NAME
UNION PACIFIC RAILROAD - STOCKTON
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
08801001
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA NA MU I N Environmental Health Department <br /> COUNTY— <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: -ata: <br /> UNION PACIFIC RAILROAD-STOCKTON 833 E EIGHTH ST,STOCKTON June 12, 2019 <br /> Qualified Facility-Tier II <br /> 501 CFR 112.6(a)(1), Tier II Qualified Facility Plan not certifietl by the owner or a PE,as required o V o R o COS <br /> 112.6(b) <br /> 502 CFR 112.6nXi Tier 11 Qualified Facility Plan technical amendment not certified by the owner or a PE oV in in COS <br /> 503 CFR 112.61 Failure to have a PE certify In writing alternative measures for a Tier 11 Qualified Facility q q oCOS <br /> 112S(b$4) <br /> 504 CFR 1126(b)(4)(I) Failure of ownerto assure that a PE makes all required attenuations In aTler 11 Plan .V .R .COS <br /> General Re"rements for SPCC Plans <br /> 601 CFR 1121 Failure of Plan to fulfill basic requirements including across-referencing section .V .R .COS <br /> 602 CFR 112.7mi Ran failed to discuss equivalent environmental protection,if applicable in in in COS <br /> 603 CFR 112.7mi Fell to adequately describeth a ph ysi cal layout of the facility In the PI an mV c mCOS <br /> 604 CFR 112.7m i) Ran failed to include oil type and storage capacity for each container mV c mCOS <br /> 605 CFR 112.7m ii) Ran failed to adequately discuss discharge prevention measures,including roulne handl, mV c mCOS <br /> 606 CFR 112](aN3)(iii) Ran failed to adequately discuss facility drainage or drainage controls mV c mCOS <br /> 607 CFR 112](a)(3)(iv) Ran failed to include countermeasures for discharge discovery,response and aearl mV c mCOS <br /> 608 CFR 112](aN3Nv) Ran failed to address disposal methods for recovered materials mV c mCOS <br /> 639 CFR 112](aN3vf), Ran failed to adeWately contain procedu res for rep ortin g a d damage mV c mCOS <br /> 112.7mi <br /> 610 CFR 112.7mi Di Aal procedures are not adequately addressed if the facility has on re isouae plan c V c R c COS <br /> 611 CFR 112.7(b) Ran failed to include a description of potential equipment falafel or provide equivalence mV c mCOS <br /> 612 CFR 112.7(c) Ran failed to include secondary containment,diversionary urudures,or equip to prevent discharge mV c mCOS <br /> 613 CFR 112.7(c) Falafel to provide appropriate secondary containment,diversionary structures or equipment mV c mCOS <br /> 614 CFR 112](4) PE ratified Plan failed to explain Impracticability of contain menVtllversion ary structures mV c mCOS <br /> 615 CFR 112](4) Falafel to perform Integrity and leak testing when claiming secondary containment impracticability mV c mCOS <br /> 616 CFR 1127(4)(1) Falafel to prepare an oil spill contingency plan when claiming Impracticability of structures mV c oCOS <br /> 617 CFR 112](4)(2) No written commitment of manpower,equipment,and materials to control and hal al dchal mV c oCOS <br /> 618 CFR 112.7ml,112.8(c) Failed to keep records of procedures,Inspections,or Integrity teetsfor6reeyeare mV q oCOS <br /> (6) <br /> 619 CFR 112.7(ftn1 Failed to Nan peal on all clscbvge preveMm debate lsted n Mie section c V c R o COS <br /> 620 CFR 112](8(2) Failed to design ate a person accountabl a for discharge p revention mV c oCOS <br /> 621 CFR 112](8(1) Failure to include In the SPCC Plan an adequate description of employee tapir, c V c R c COS <br /> 622 CFR 112](8(3) Failu re to con duct complete annu al d lscharg a prevention briefing s for oil-hand lin g personrrst mV c mCOS <br /> 623 CFR 112.7(g) Ran failed to add read security of site al valves,lock oumag out,and ll ghti ng mV c mCOS <br /> 624 CFR 112.7(g) Facility failed to implement security ofate and valves,lock oumag out,and lighting mV c mCOS <br /> 625 CFR 112.7(h) Ran failed to adequately discuss facili[ytan k car an tank truck loadin glun load Ing rack mV c mCOS <br /> 626 CFR 112.7(hN1) Load inglunl oadi ng rack containment system not adequate to contain spill mV c mCOS <br /> 92r CFR 112.7(hN2) Failed to provide vehicular departure system for bear,and unloading racks mV c mCOS <br /> FMiXi P110529403 SM01 061=019 <br /> EHDMhOn Rcr.0.l9/A1S Page 2of6 Abaveg J Ptlrtlam Slow,AC OIR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 4840138 1 mAvvv.sjoehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.