Laserfiche WebLink
Ruvalcaba, Cesar <br /> From: Michael). Fallon <mjfallon@up.com> <br /> Sent: Monday,July 8, 2019 7:40 AM <br /> To: Ruvalcaba,Cesar <br /> Subject: Re:APSA/SPCC inspection report- PR0529406 <br /> Attachments: Stockton TNKO-0295 STI Tank Inspection Report 20 Year- Final.pdf, TNKG - 0079 <br /> Monthly Tank Inspecrton - lune 2019.pdf, Return to Compliance Cl Appendix F 1 - <br /> Tank Inspection Schedule- Stockton V 5.0- STI.pdf <br /> Hi Cesar, below and attached are the items to clear the APSA inspection at the Stockton Yard. <br /> Mike <br /> 1. Secondary containment inspection of the fuel/gas lank TNKG-0079. The operators of that tank have identified the <br /> access port to conduct the inspection and will conducted that inspection going forward. Attached is the June inspection <br /> report. <br /> 2. The W WTP used oil tank had its 20 year STI tank inspection in May 2019. Attached is the inspection report. <br /> 3. SPCC Plan Appendix F update to include inspection standard. Attached SPCC plan appendix F <br /> 100ael J.Fallon <br /> union Pacific Railroad <br /> 90.51 Atkinson ST <br /> Roseville California,95747 <br /> (916)769-5184 <br /> From. "Ruvaioaba,Cesar"<cmvalcaba@sjgw.org> <br /> To. "Michael J.Fallon'<mifallon@up.mm> <br /> Date OWZ20191253 PM <br /> Subject APSNSPCCnspection report-PR0529406 <br /> 1 <br />