Laserfiche WebLink
Mr. Andrew Smith • - 3 - • 10 June 2004 <br /> that the effluent limit required by the General Order are met to ensure the treatment system is operating <br /> properly. <br /> The Discharger shall notify Regional Board staff five working days before the startup of the treatment <br /> system so we may have the opportunity to be on site to collect split samples. <br /> GENERAL INFORMATION AND REQUIREMENTS <br /> General Order No. 5-00-119 (enclosed) prescribes mandatory discharge monitoring requirements for <br /> compliance with the General Order. The project activities shall be operated in accordance with the <br /> requirements contained in the General Order and with the information submitted in the application packet. <br /> The upstream and downstream receiving water location (R-1 and R-2, respectively) shall be approved by <br /> Regional Board staff as required in Attachment B (Monitoring and Reporting Program, MRP) of the <br /> enclosed General Order 5-00-119. The present proposed receiving water locations are 50 feet upstream <br /> and 50 feet downstream of the discharge location. Within five working days of receipt of this Notice <br /> of Applicability, the Discharger or appropriate representative shall schedule with Regional Board staff to <br /> conduct a site inspection and establish appropriate receiving water sample locations. <br /> Regional Board staff shall be notified immediately if any nuisance or detriment to the receiving waters is <br /> observed during the implementation of the project. Failure to abide by the conditions of the General <br /> Order could result in an enforcement action as authorized by provisions of the California Water Code. <br /> The required annual fee (as specified in the annual billing you will receive from the State Water <br /> Resources Control Board) shall be submitted until this Notice of Applicability is officially terminated. <br /> Please notify this office in writing when the project has been completed and the discharge is no longer <br /> necessary, so we may terminate applicability of this General Order. <br /> If you have any questions or comments regarding this Notice of Applicability,please contact Ms. Devra <br /> Lewis at(916) 464-4719 or lewisd@rb5s.swrcb.ca.gov. <br /> rI JUrWtOA RRAV� <br /> THOMAS R. PINKOS <br /> Executive Officer <br /> Enclosures: General Order No. 5-00-119 <br /> State Implementation Policy Requirements <br /> Standard Provisions <br /> cc: U.S. Environmental Protection Agency, Region IX, San Francisco <br /> U.S. Army Corps of Engineers, Sacramento <br /> Ms. Frances McChesney, Office of Chief Counsel, State Water Resources Control Board <br /> Mr. Clifford Bowen,Department of Health Services Office of Drinking Water, Berkeley <br /> Mr. Jerry Boles, Department of Water Resources, Red Bluff <br /> Department of Health Services Environmental Management Branch, Sacramento <br /> Department of Fish and Game, San Joaquin Valley/Southern Sierra Region, Fresno <br /> Mr. Mike Negrete,NPDES Section, Regional Water Quality Control Board, Sacramento <br /> Mr. James Barton,UST Unit, Regional Water Quality Control Board, Sacramento <br /> MS Margaret Laggorio,..�, an Joaquin County Environmental Health Department Stockton <br /> Mr. Daniel Kalmbach, Advanced GeoEnvironmental, Inc., Stockton <br />