Laserfiche WebLink
12 September 2003 <br /> AGE-NC Project No. 01-0865 <br /> Page 5 of 7 <br /> method selected and for all necessary construction work,including electrical source installation. A <br /> minimum of 48 hours notice will be given to the EHD prior to performing any field work. <br /> 4.2. REMEDIATION SYSTEM PIPING NETWORK <br /> A network of two-inch diameter,schedule 80 polyvinylchloride(PVC)piping will be installed from <br /> the remediation wells in a series of trenches,approximately 12-inch wide and 18-inches deep. This <br /> piping will house the air supply and fluid outlet lines running to and from the pump.All PVC piping <br /> will be routed underground from the remediation well head to the pump-and-treat holding tank, <br /> located inside the remediation system fenced enclosure.Following piping placement,the trench will <br /> be backfilled with imported road-base sand, compacted and covered with resurfaced with sod or <br /> concrete depending on the surface terrain. A cut view drawing of the process piping layout is <br /> included in Figure 5. <br /> 4.3. GROUND WATER EXTRACTION SYSTEM <br /> An air-driven down well pump will be installed in well EW-1 (Figure 7).Air supply and fluid return <br /> lines will be routed from the custom cap at the top of the well to the pump, air return hose will also <br /> be connected to the pump and allowed to vent at the well head(Appendix B).To minimize sediment <br /> intake through the pump,the bottom of the pump/motor assembly will be suspended approximately <br /> one foot from the bottom of the well. Ground water will be continuously pumped from the bottom <br /> of the 6inch diameter well EW-1 at low-flow rates between 0 and 3 GPM and routed through <br /> underground PVC piping to a 750-gallon holding tank. <br /> The air-driven groundwater extraction pumps will be run by an air compressor located in the <br /> remediation system enclosure(Figure 6).The air is routed to the pumps through a series of trenches <br /> as mentioned above.AGE anticipates total ground water extraction flow between two and five GPM. <br /> 4.4. GROUND WATER TREATMENT SYSTEM <br /> From well EW-1, extracted ground water will be routed to a 750-gallon holding tank, from which <br /> it will pass through a process pump and a 1-micron sediment bag filter to the three-stage treatment <br /> system. The holding tank is equipped with various level control switches which serve to control the <br /> rate at which extracted water is introduced into the treatment vessels, to provide safety shutoff <br /> capabilities and to allow coarser sediment to settle out prior to treatment. <br /> Advanced GwEnvironmentel,Inc. <br />