Laserfiche WebLink
SITF BACKGROUND <br /> (ht Oetobei 10 1991 batten F (lomeS 1~tea�atino ine of Rio Vista (alifornia CXLavatLd and ie.nlovc.il three <br /> 1'S l s ( T K I Th-' and 1K3)) horn the Site The t STS t_ontained g9asoline and diesel fuel X (candor <br /> representative waS on site doling the US I removal to collect soil samples File field ac.tivitieS were observed by <br /> ( arol 0/ of the PIIS/EIID A Small hole was found on the lowf,l fill end of TK3 (diesei tank) Petto]cum <br /> Staining and odols wcic noted in till. 1,011 beneath tht formel Ideations of the USTs Gr011ndwater was not <br /> cnunintLrccl dursng the l S i Iesnoval Six soli Sample', were collected by ( ondor frotm the IJS f LvLavation at <br /> depths of t) to I' lett befnw the ground ',urtace 1 he sample,, were analyzed for TPH-(, {gasolmc) B I LN 1 LPH <br /> (dILI,Ll) 11)13 feth\iene dibiomide) and total lead Laboiator,, analyse,, indicated elevated vo1ict11ttatui1ls of <br /> 1 PH-(i I LP1I and 1311,\ constituents in the Soil Samples For additional information ieter to Tank Pull <br /> I csrrni~ Rc shits pteparLd b. ( ondot elated November IS 199] <br />' At the dncetton (It the PIIS/1 HD ( ondor picpared a kvoik plan to InveStlgate the ga',01111L and diesel <br /> coittainlriatioil 1',SOLiated with the fortner US fs (Awl incl Giounduuter 1pwestrgulmn Work Plan dated May 30 <br /> 1995) 1lie work plan was approved by the PHSYFITD and the Reclamation District 92029 <br /> On August 22 1995 three hydropurtch boreholes (I IP-1, IIP-2 and IIP-3) were drilled at tilt., ',rte (see the fibure <br /> attached to the back of Appendix B for borehole locations) Ronald Rowe of the PIIS/El1D was on site <br /> periodically to observe the fieldwork (rilbert ( osio of 'Murray, Burns and Kienlen 1 ngineering was on site to <br /> observe the drilling aLtl',itics as a Reclamation Distrzet representative fwo of the hydropuneh borehoies (11P-1 <br /> and HP-2) \,kLrc located on the Icvee and were drilled to depths of approximately 16 and 1 1 feet helow the top of <br /> the le\ee (btl) respectively the third hydroptinch borcholc (IEP-3) was located below the levee and was drilled <br /> to a depth of approximately 6 feet beiow ground Surface (bgs) Sot] Samples were eoflected at five toot intervals <br /> (,roundwatcr ',ample.', wise eol[ceted using a l lydropunch 11 groundwater Sampler (,asoline odors were noted in <br /> each borehole l aboratoi} ana]vse,, indicated t,c}ricentratioris of I-PH-(, and B 11=X in the soi[ and groundwater <br /> Samples analwed from eaeh borLI101L (See I able,, 13 1 and B 2 bclo%v) <br /> I1"ABLE B 1 <br /> Laboratory Results (Soil- August 1995) <br /> B T E X TPH-G TEPH <br /> Detection 50 so 50 so 10 1 0-10 <br /> Sample t D Limits mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg <br /> 1433-11x'1-11 (4) 1 200 3 100 5 500 22 000 300 190(diesel) <br /> 1432-111'2-1 1 0) N1) ND 130 2 800 22 ND <br /> 1432-11P3-5 � 61 118 52 91 7 5 16(diesel) <br /> Note 1 ht,last number in each simple lri indicates the depth at which the sample was collected <br /> (nit( unNersions Analytical <br /> mg/kg pacts per million(ppm) B rEX benzene tolut.nr. ethyl benzene and total xylenes <br /> rP1141 total petrnieum hydrocarbons quantified as gasoline <br /> rEPH=total extractable petroleum hydrocarbons quantified as diesal motor oil <br /> and kerosene <br /> ND now.detected at or above,laboratory detection limits <br /> 4 efe.tecuon limits rai,;O due to gasoline.intcrterencc. <br />