Laserfiche WebLink
i <br />' SITE BACKGROUND <br /> On ()ctobEr 30 1991, Warren E Gomes Excavating Inc , of Rio Vista, California, excavated and removed three <br />' 1-�STs (-1 K1 1 K2 and TK')) from the site The USTs contained gasoline and diesel fuel A Condor <br /> representative was on site during the UST removal to collect sol] samples The field activities were observed by <br /> Carol Os of the PHS/EHD A small hole was found on the lower fill end of TK3 (diesel tank) Petroleum <br />' staining and odors were noted in the soil beneath the former locations of the USTs Groundwater was not <br /> encountered during the 17ST removal Six soil samples were collected by Condor from the UST excavation at <br /> depths of 9 to 12 feet below the ,round surface I he samples were analyzed for TPH-Cr (gasoline), BTFX 1 EPH <br /> (diesel) l,D13 (ethylene dibromide) and total lead Laboratory analyses indicated elevated concentrations of <br /> I PH-(1, I 1 PH and Fd constituents in the soil samples I or additional information refer to Tank full <br /> TeitinV Re6ulls prepared by C ondor dated November 18 1991 <br /> kt the direction of the PHS/EHD Condor prepared a work plan to investigate the gasoline and diesel <br /> Contamination associated with the former US rs (Soil and(groundwater Investigation Work Plan, dated May 30, <br /> I1995) 1 lie work plan was approved by the PIIS/EHD and the Reclamation District#2029 <br /> On August 22 1995, three hydropunch boreholes (IIP-1, HP-2, and HP-3) were drilled at the site (see the figure <br /> attached to the bat k of Appendix B for borehole locations) Ronald Rowe of the PHS/EHD was on site <br /> periodically to observe the fieldwork Gilbert Cosio of Murray, Burns, and Kienlen Engineering was on site to <br /> observe the drilling activities as a Reclamation District representative Two of the hydropunch boreholes (HP--1 <br /> and IIP-2) were located on the levee and were drilled to depths of approximately 16 and 1 1 feet below the top of <br /> the levee (btl) respectively Mlle third hydroptinch borehole (IIP-3) was located below the levee and was drilled <br /> to a depth of approximately 6 feet below ground surface (bgs) Soil tramples were, collected at five toot intervals <br /> I • (,roundwater samples were collected using a I lydropunch I1 groundwater sampler Gasoline odors were noted in <br /> each borehole 1 aboratory analyses indicated concentrations of FPH-G and H FEX in the soil and groundwater <br /> samples analysed from each borehole (set, fables H 1 and 13 2, below) <br /> TABLE B 1 <br /> Laboratory Results (Sail - August 1995) <br /> B T E X TPH-C TEPH <br /> Detection 50 so 50 50 10 10-10 <br /> Sample I D Limits mg/kg mg/kg mg/kg mglkg mg/kg mg/kg <br /> 1432-11131-1 ; (4) 1200 3 100 5 500 22 000 300 190(diesel) <br /> 1432-ItP2-1 1 (4) ND ND 130 2 800 22 ND <br /> 1432-HP3-5 5 61 68 52 91 75 16(diesel) <br /> mote Tht last number in tach sample 1D indicates the dtpth at which the sample was collected <br /> I nit Conversions Analytical <br /> mg/kg parts per million(ppm) $TFX -benzene toluene ethyl benzene and total xylenes <br /> TPH-(1=total petroleum hydrocarbons quantified as gasoline <br /> TFPH total extractable petroleum hydrocarbons quantified as diesti motor oil <br /> and kerosene <br /> I ND none detected at or above laboratory detection limits <br /> 4 - detection limits raised due to gasoline intirterence <br />