My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
15135
>
2900 - Site Mitigation Program
>
PR0518132
>
ARCHIVED REPORTS XR0006997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 8:23:08 PM
Creation date
7/10/2019 11:50:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006997
RECORD_ID
PR0518132
PE
2960
FACILITY_ID
FA0013716
FACILITY_NAME
H & H MARINA
STREET_NUMBER
15135
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06908021
CURRENT_STATUS
01
SITE_LOCATION
15135 EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IFirrmtn& Helm 5 M Irma -8ec and Quarter 1998 Groundw iter Monitoring <br /> Auguq 11 1998 <br />' Page 7 <br /> 4 SUMMARY/CONCLUSIONS <br /> I he gasolnie oa-ygenatc M [BE %gas cictec,ted in samples coilec,ted from monitor wells MW-2 and MW-3 at <br /> conLentrations of 3 000 lig/l and 1 800 ugd respectively MTBE was detected at a much loticr umcentration of <br /> 2 3 µg/l ui the ,Ample, cnllc.eted from MW-4 No oxygentates were detected in the sample collected from MW-1 <br /> TPH-G (0 5 Ing/1) buizcne (38 pg/[), etliylbc.nzene (30 jig/]), and X)lencs (42 lig/I) %sere detected III the. Sample <br /> L0llected from MW-4 No TPI f-G or 13 I EX constrtucnts were, reported to be present 1n any of the other wells <br /> I he detection limit-, for I PI I-G and 13 FEX were raised for the ,amplcs collected from MW-2 and MW-3 due to <br /> elevated M I BE C.oneentrations in those, samples <br /> Laboratory anaINIt"il resultS of the gIOLindwatei samples eoileeted during the See�ond quarter 1998 monitoring <br />' event were; generally Lunslstent with historical quarterly groundwater analytical data The MTRF e.oneentration <br /> In the. ,ame. <br /> ple nllccted from MW-2 dLLreased significantly, rLversing a trend of increasing coi7ecntrations <br /> associated Frith previous quarterly monitoring reS111ts <br />' Lvaluation of intruISIL bioremediation parameter, is best done using a data set that includes as much as one year <br /> of monitoring Additional monitoring of the intrinsic bioremediation parameters should COnElnuc. to evaluate the <br /> Ipotential for intrinsic bioremediation at the site <br /> Groundwater elevatioii measurements collected at the site on June 26, 1998, indicated that the average depth to <br />' groundwater was approximately 5 feet bgs which is consistent with groundwater elevation measurements <br /> collected on March 27, 1998 (rroundwater elevation contours for June 26, 1998, indicate that the groundwater <br /> graditnt at the Site is generally consistent with that measured on September 18, 1997, December 31, 1997, and <br /> March 27, ]99K <br /> In a te.icphone corivcI-sation on March 23, 1998 Mr Ronald Rowc, of the San Joaquin County Public Health <br /> Services/1 iivironmental Ilealth I)c,partment (PIIS/I 111)) sndlcated that based on his review of the proJect to date, <br /> he was requesting quarterly groundwater monitoring continue at thi, site and a work plan be prepared to conduct <br /> quarterly surface water sampling and additional investigation of the gasoline oxygenate/additive plume east of <br /> site monitor well MW-2 A work plan, as described above, was prepared by Condor on May 27, 1998 In <br /> correspondence dated July 1, 1998, Mr Rowe conditionally approved the work plan and requested an addendum <br /> On July 9, 1998, Condor submitted an Addendum to the Work Plan The scope of services outlined in the <br /> addendum included <br /> • Locating the, drinking water source for I ILrman & Helen's Marina <br /> + Sampling the, drinking water source for laboratory analysis of gasoline additives/oxygenates by EPA <br /> Method 8260 <br /> • Completing a survey ofthe area to identify users and receptors of ground or surface water within a 1,000 <br /> feet radius of the site <br /> • Installation of nine soil borings to further evaluate the eastern extent of the contaminant plume <br /> On July 27, 1998, Mr Rowe provided authorization of the work plan addendum and requested that the pre- <br /> treatment and post-treatment water supply associated with the drinking water system at the site be sampled and <br /> analysed by EPA methods approved for surface drinking water, including analysis for MTBE, DIPS, ETBE, <br /> TAME, Ethanol, and tertiary-butanol <br /> I <br /> LJ CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.