Laserfiche WebLink
BORING 10 GPI <br /> CONDOR EARTH TECHNOLOGIES - Geological Log PAGE 1 OF 1 <br /> ' PROJECT NO 1932 DATE8/29/96 <br /> PROJECT Herman d Helen's Marino TOTAL DEPTH 9.0' WELL CONSTRUCTION DETAIL <br /> t LOCATION Venice Island Ferry, Stockton, CA HOLE DIAMETER 2" TOTAL CASING DEPTH - <br /> DRILLING CONTRACTOR Vironex HAMMER WEIGHT AND FALL N/A CASING DIA./SIZE - <br /> SCREEN SLOT SIZE - <br /> DRILL EOUIP GeoProbe SURFACE CONDITIONS Asphalt SCREEN INTERVAL- <br /> , DRILLING METHOD Direct Push DEPTH TO STATIC WATER 5.5 FILTER PACK NER- <br /> RENTCNITE SEAAL L INTTERVAL - <br /> LOGGED BY Jomes WEEK: WELL COLLAR ELEV N/A GROUT INTERVAL - <br /> ' DEPTH 8 FIELD DESCRIPTION SAMPLE a> WELL REMARKS <br /> (FT) u i 'o <br /> in o °u°u GRAPHIC <br /> M /IO m <br /> D u®goo aven <br /> 1 PEAT dark brown. DV j <br /> 2 moist. petroleum odor: <br /> 3 PIE 50 ppm <br /> t <br /> 9 <br /> S Pt GPI-5 <br /> = PEATY dark brown; <br /> 6 came as above; saturated. PIE 0 ppm <br /> 7 <br /> R collect water sample <br /> Pt 1932-GP9-8/29/96 <br /> ' 9 GP9-9 <br /> Total Depth 9' <br /> 10 <br /> 11 <br /> ' 12 <br /> 13 <br /> 19 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> ' 23 <br /> 29 <br /> ' 25 <br /> 26 <br /> 27 <br /> ' 2U <br /> 29 <br /> 30 <br /> ' 31 <br /> 32 <br /> 33 <br /> ' 39 <br /> 35 <br /> 1 <br />