My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
15135
>
3500 - Local Oversight Program
>
PR0544644
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:56:52 PM
Creation date
7/10/2019 4:44:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544644
PE
3529
FACILITY_ID
FA0005287
FACILITY_NAME
H & H MARINA
STREET_NUMBER
15135
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06908021
CURRENT_STATUS
02
SITE_LOCATION
15135 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Work Plan-Soil and Groundwater Investigation <br /> Herman&Helen's Marina <br /> May 20, 1996 <br /> Paye 2 <br /> Petroleum staining and odors were noted in the soil beneath the former locations of the USTs. <br /> ' Groundwater was not encountered during the UST removal. Six (6) soil samples were collected by <br /> Condor from the UST excavation at depths of 9 to 12 feet below the ground surface (bgs). The <br /> ' samples were analyzed for TPH-G (gasoline), BTEX, TEPH (diesel), EDB (ethylene dibromide), and <br /> total lead. Laboratory analyses indicated elevated concentrations of TPH-G, TEPH, and BTEX <br /> ' constituents in the soil samples. For additional information, refer to Tank Pull Testing Results, <br /> prepared by Condor, dated November 18, 1991. <br /> ' At the direction of the PHS/EHD, Condor prepared a work plan to investigate the gasoline and <br /> ' diesel contamination associated with the former UST's (Soil and Groundwater Investigation Work <br /> Plan, dated May 30, 1995). The work plan was approved by the PHS/EHD and the Reclamation <br /> tDistrict #2029. <br /> ' On August 22, 1995, three (3) hydropunch boreholes (HP-1, HP-2, and HP-3) were drilled at <br /> the site (Figure 2, Appendix A). Ronald Rowe of the PHS/EHD was on site periodically to observe <br /> ' the fieldwork. Gilbert Cosio of Murray, Bums, and Kienlen Engineering was on site to observe the <br /> drilling activities as a Reclamation District representative. Two (2) of the hydropunch boreholes (HP- <br /> ' I and HP-2) were located on the levee and were drilled to depths of approximately 16 and 11 feet <br /> below the top of the levee (btl), respectively. The third hydropunch borehole (HP-3) was located <br /> ' below the levee and was drilled to a depth of approximately 6 feet below the ground surface (bgs). <br /> Soil samples were collected at five (5) foot intervals. Groundwater samples were collected using a <br /> Hydropunch II groundwater sampler. Gasoline odors were noted in each borehole. Laboratory <br /> ' analyses indicated concentrations of TPH-G and BTEX in the soil and groundwater samples analyzed <br /> from each borehole (see Tables 1 and 2, below). <br /> 1 <br /> 1 <br /> ' t� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.