Laserfiche WebLink
i.. <br /> DAILY SUMMARY <br /> DAA: JOB NUMBER <br /> 1.r <br /> VVEAIIE R <br /> �r <br /> FIELD HOURS <br /> Time on Site: 7 Lunch Hours <br /> Time off Site: �y o Downtime Hours' �- <br /> LN [Standby Hours2 'C�Y <br /> Client's signature ve ' e <br /> i= on and off site: n.,.•.. <br /> Billable Hours(office us only): <br /> r <br /> NOTE: REPORT TrtfE TO NEAREST OLS HOURS <br /> DECONTAMINATION <br /> Probe Decontamination Syringe Decontamination <br /> Total Hours: d Total Hours: <br /> : LN <br /> Signature of verification by GC Operator: Signature of verification by Field Assistant: <br /> t� <br /> SAMPLING AND ANALYSIS <br /> Calibration Sampling Anal>sts <br /> S � <br /> Time Start: 5 DVacuum used(Check one): Total System Blanks: <br /> . yaphram <br /> Transducer <br /> Time End: ;L) Max Vacuum: ; 7 (at Hg) Total Ambient Air Samples: <br /> V <br /> Total Hours: Probes Used: j 1 Total Analytical Blanks: j <br /> 15 Points Used: Total Water Blanks: <br /> Soil Gas Water Samples Collected: <br /> Samples Collected: J/ 0 <br /> 1-Downtime includes time spent repairing sampling&analytical equipment;note times and explanation on following Feld data pages <br /> 2_Standby includes time available for sampling but waiting for client;note times and explanation on following field data pages <br /> I rear It-ch corpova me <br /> 1 <br />