Laserfiche WebLink
- 1 <br /> i <br /> 4.J SITE SAFETY PLAN 954-006 <br /> 242_ <br /> ProjectNumber: 0 <br /> Tate: 812612000 <br /> A SITE DESCRIPTION <br /> #' uiva Services LLC California. <br /> Client: Eq <br /> Site Address: 14l-North El Dorado Street, Stockton, A cultural [] Other <br /> Site UselConditions:Former Shell,Comeocial [ ]Industrial [ } g Unpaved [ ]other <br /> Residential IX] [ } Open Excavation [X]Paved [] <br /> Area Land Use: CFlat [} Y <br /> Topography: [XI cloudy. wells, 2 groundwater <br /> Weather Conditions: Clear topartly roundwater monitoring methods <br /> WORK TO BE PERF ORM <br /> ED: Destruction of 5 pressure grouting or overdrilling <br /> recovery wells,and 4 soil vapor extraction wells by <br /> Fence. Cones [X} Fence <br /> C prl SITE CONTROL: ., ti Tape [} <br /> I• been established. The boundaries are defined by- [] <br /> A safe perimeter has 25 feet <br /> []Other' nated as: — <br /> The Contamination Rdds ctia1e�ase50 <br /> The Support Zone �s <br /> CHEMICAL HAZARD EVALUATION <br /> of the following compounds are expected at the site: <br /> Suspected or known concentrations Water . <br /> Ambient Soil TWA IDLH <br /> Free Product Cone. Cone. <br /> Air <br /> Compound (thickness) Cone. <br /> S50 ppb 300 PPMNA 360 ppm <br /> NA m 2.8 ppb 1.0 ppm 500 porn <br /> Gasoline NA <0.25 pp <br /> NA b 40.ppm <br /> Benzene 7.09 ppm 39 pp <br /> NA <br /> NA <br /> MTBE <br /> SDS)or equivalent are attached. <br /> °o of the lower explosive limit(LEL). compounds: <br /> X}' Applicable material safety data y exceed <br /> exceed 10%[ Vapor-phase concentrations may <br /> 'ons may exceed OSHA pEL or 8-hour TW A for the following <br /> [} <br /> vapor-phase concentrations[} Vapor-p „.:--- <br /> i! <br /> pHySICAL HAZARD EVALUATION' An underground line detector survey <br /> Pro 'ss lines have been identified. moving machiner• <br /> [X] Underground utilities and or p heavy objects, <br /> is not required• hazards associated with lifting ui ment. <br /> and operating or Working near electrical eq p <br /> [X] Personnel are aware of the <br /> ll safety <br /> a confined entry checklist is attached and proPe <br /> and equipment' slipping' required. If required, <br /> [X} Confined space entry is not <br /> confined space entry procedures will be followed <br /> 1376 <br />