My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012678
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
141
>
3500 - Local Oversight Program
>
PR0544645
>
ARCHIVED REPORTS XR0012678
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 12:40:53 PM
Creation date
7/11/2019 10:11:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012678
RECORD_ID
PR0544645
PE
3528
FACILITY_ID
FA0004979
FACILITY_NAME
CIVIC CENTER PARKING*
STREET_NUMBER
141
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909002
CURRENT_STATUS
02
SITE_LOCATION
141 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> _ W-1 <br /> a M- M_ -Z! <br /> . <br /> Between sampling events, the sampling equipment was cleaned using a <br /> 2. three-bucket wash system. In this system, the rings and samplers <br /> were scrubbed with a brush .in a bicket of tap water and detergents <br /> rinsed in a second bucket cf tap water and given a final <br /> rinse in <br /> distilled water. <br /> 4.4 Vadose and Monitoi:ing hell Installation <br /> Three soil borings were drilled to an approximate depth of 30 feet <br /> below grade in the visiniLy of the former storage tank pit and <br /> canvezted to vapor extraction wells with the installation of 4 inch <br /> diameter PVC screen and casing. Vapor extraction well construction <br /> r` details are shown in Figure 6. A vapor extraction feasibility teat <br /> was conducted on April 27 and 26, 1991 to determine the possibility <br /> of vapor extraction as a remediation option for the vadose zone at <br /> r the site. Results of this vapor extraction test are present_a- in <br /> Appendix II. <br /> Barings MW-4 and MSI-5 were advanced 15 feet beyond static groundwater <br /> anti converted to monitoring wells by the instal3ation of 20 feet of <br /> slotted screen with casing to the surface. Bath wells were f <br /> cunatructpd of 2-inch diameter, flush-threaded, schedule 40 PVC <br /> �- screen and casing (Figure 7) . Both wells were completed at grade in <br /> �. water-tight, street-rated well protectors with water-tight locking b <br /> caps for security purposes. <br /> '. Following. installation, each groundwater well was developed using a <br /> r pneumatic pump, Development water was containerized in DOT approved <br /> drums and stared on site Pe laboratory analyses. The top, north <br /> common datum for <br /> situ of the casing was surveyed relative to a <br /> determining groundwateb gradient information. Surveying was <br /> �- performed under the direct supervision of a California Registered <br /> Civil Engineer. <br /> ti <br /> Malar PoLrt Property - 415 - : 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.