My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012678
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
141
>
3500 - Local Oversight Program
>
PR0544645
>
ARCHIVED REPORTS XR0012678
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 12:40:53 PM
Creation date
7/11/2019 10:11:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012678
RECORD_ID
PR0544645
PE
3528
FACILITY_ID
FA0004979
FACILITY_NAME
CIVIC CENTER PARKING*
STREET_NUMBER
141
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909002
CURRENT_STATUS
02
SITE_LOCATION
141 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br /> s <br /> i <br /> waterWork , LA0 <br /> Health and Safety Plan / iY <br /> Weber Point �9 <br /> 1 Dorado 5t. <br /> 1Stockton, CA <br /> ��C <br /> s �y <br /> INTRODUCTION <br /> PURPOSE AND SCOPE <br /> The Health and Safety Plan, for soil and groundwater investigations, <br /> provides for the protection of on-site <br /> surrounding community during site Gharacteri ationne ctivitiesl and e <br /> The requirements, ,opacifications and procedures presented with <br /> this :plan will. apply to all <br /> entployaes,. si!b-contractors, site visitors landregulatoryncluding <br /> personnel, agency <br /> KEY PFASONNEL <br /> WaterWork's Safety Coordinator/Project Manager will provide <br /> i;rsining to site personnel in the use of safety and personal <br /> protection equipment and will manage the on-site monitoring <br /> Program. The Safety Coordinator/Project Manager will <br /> authority to deny access have the: <br /> to any individual without the props <br /> r <br /> training or protective equipment _•equired for the site conditions <br /> or those individuals disregarding site safety procedures. All <br /> site personnel will be under the direction of the Safety <br /> Coordinator/Project Manager. <br /> HAZARD ANALYSIS <br /> The property previously operated a gasoline and/or diesel fuel <br /> distribution facility. Historic data and evaluation of <br /> subsurface indicate the presence or potential presence of <br /> hydrocarbon fuel contamination. <br /> The activities addressed by this safetyw - - <br /> subsurface soil and .Alan include surface and <br /> activities groundwater sample collection. These <br /> present the potential for exposure to toxic materials <br /> through both skin contact and inhalation. <br /> The subsurface <br />
The URL can be used to link to this page
Your browser does not support the video tag.