M _ _ <br /> INN M' <br /> 3.3.3 Pump Test <br /> A series of short and longer term (6-12 hrs) constant rate pump- <br /> ing tests will be performed in the new upgradien•t monitoring well <br /> to determine: 1) aquifer characteristics including hydraulic <br /> conductivity, storage coefficient and boundary conditions, 2) <br /> pump sizing pump and sustainable pumping rate for evaluating <br /> remedial activities. <br /> �. The pumped water will be stored on site until laboratory analysis <br /> allows for disposal, under permit, to the City sewer system. <br /> 3.4 Problem Assessment Report <br /> A Problem Assessment Report will be prepared .sc:ording to Regi-jr— <br /> al Board guidelines summarizing the findings of the investigation <br /> and recommending remedial action alternatives, as appropriate. <br /> �- The :Field investigation will be conducted under the direct super- <br /> vision of Russell W. Juncal, CA Registered Geologist No. 3864, <br /> who will review and sign the assessment report. <br /> zW 4.0 TIME LINE <br /> Following agency approval the estimated time ,necessary to com- <br /> plete. the tasks proposed in this workplan is 8 weeks. Following <br /> agency approval., the distribution of tasks -over this time period <br /> is shown below. Actual time may vary depending on drill rig <br /> availability, laboratory turn-around and unforeseen circum- <br /> stances. <br /> } <br /> 5 <br /> Y <br /> eI: <br />\ F <br /> —. 6 <br />