My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007466
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
141
>
3500 - Local Oversight Program
>
PR0544645
>
ARCHIVED REPORTS XR0007466
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 11:11:11 AM
Creation date
7/11/2019 10:15:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007466
RECORD_ID
PR0544645
PE
3528
FACILITY_ID
FA0004979
FACILITY_NAME
CIVIC CENTER PARKING*
STREET_NUMBER
141
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909002
CURRENT_STATUS
02
SITE_LOCATION
141 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> 1050 Melody Lane, Suite 160, Roseville, Lalli ;;JOL0 678 <br /> EQ' (91 3'",M � 786 7830 <br /> ENVIRONMENTAL, INC. <br /> October 12, 1993 <br /> Mr Lynn Walker <br /> Shell Oil Company <br /> Post Office Box 5278 <br /> Concord, California 94520 <br /> Subject Quarterly Groundwater Mondonng and Remediation Report <br /> Former Shell Service Station (WIC No 204-7524-1509) <br /> 141 N EI Dorado, Stockton, California <br /> Dear Mr Walker <br /> Aegis Environmental, Inc (Aegis), is pleased to provide Shell Oil Company the attached <br /> information documenting the results of quarterly groundwater monitoring, conducted on <br /> August 26, 1993, at the subject site by Blaine Tech Services, Inc , of San Jose, <br /> California <br /> Groundwater recovery/sewer discharge and a soil venting system with granular activated <br /> carbon (GAC) emissions control are currently in operation The groundwater recovery <br /> system operation (pumping from wells RW-1 and RW-2) commenced on March 2, 1993 <br /> The venting system operation (extraction from VP-1, VP-2, VP-3, and VP-4) commenced <br /> on June 23, 1993 The venting system has been shutdown since September 21, 1993, <br /> pending GAC replacement <br /> Aegis has performed groundwater remediation system monitoring according to the sewer <br /> discharge permit issued by the City of Stockton Municipal Utilities Department Monthly <br /> sewer discharge reports have been submitted to the regulatory agencies Sewer <br /> discharge data since system startup in March 1993 is included as Attachment 4 <br /> 93 011 A OMR <br />
The URL can be used to link to this page
Your browser does not support the video tag.