My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007480
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
141
>
3500 - Local Oversight Program
>
PR0544645
>
ARCHIVED REPORTS XR0007480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:07:29 PM
Creation date
7/11/2019 10:20:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007480
RECORD_ID
PR0544645
PE
3528
FACILITY_ID
FA0004979
FACILITY_NAME
CIVIC CENTER PARKING*
STREET_NUMBER
141
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909002
CURRENT_STATUS
02
SITE_LOCATION
141 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
First Quarter Groundwater Monitoring Report U ��� <br /> is C M Weber Enterprises, Stockton, California <br /> April 2, 1992 <br /> All purged water was containerized In DOT approved drums and left on site pending laboratory <br /> analyses Water containing nondetectable concentrations of BTEX and TPHG will be disposed <br /> of at the site by dumping the water within the planters <br /> Laboratory analyses determined that petroleum hydrocarbons, above method detection limits, <br /> were detected in monitoring wells MW-1, MW-2 and MW-3. All constituents, except benzene <br /> and total xylenes are below the Maximum Contaminant Levels (MCL's) Laboratory reports <br /> with chain-of-custody documents are presented in Attachment 2 Table 2 summarizes laboratory <br /> results since April 1991 <br /> On January 21, 1992, an Authority to Construct permit (No AP91-467) was granted for an <br /> internal combustion engine to be used for in-situ soil remediation system at the site The system <br /> became operational on January 24, 1992 During its operational period, the system removed 70 <br /> pounds of contaminants from the soil The system was shut-down, however, on March 13, <br /> 1992, due to performance restrictions inherent to the extraction vapor However, to maximize <br /> remediation efforts, a Thermal Oxidizer became operational on March 31, 1992 after approval <br /> of an Authority to Construct permit <br /> Construction of the groundwater remediation system is complete and ready for start-up pending <br /> approval of the Waste Discharge permit from the California Regional Water Quality Control <br /> Board If you have any questions regarding this project, please contact me or the Project <br /> Manager, Tina Le Page, at our Escalon office (209) 838-3507 <br /> Respectfully, <br /> RESNA Industries <br /> Michael Delgado <br /> Probe t Engineer /� <br /> Gregory P Stahl <br /> CA Registered Geologist No 5023 <br /> MAD/ggk <br /> Attachments <br /> PC Beth Thayer - CA RWQCB <br /> Jeannie Zolezzi - Neumiller & Beardslee <br /> John Weber - C M. Weber Enterprises, Inc <br /> QR032692 MAD <br />
The URL can be used to link to this page
Your browser does not support the video tag.