My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007507
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
141
>
3500 - Local Oversight Program
>
PR0544645
>
ARCHIVED REPORTS XR0007507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 12:15:42 PM
Creation date
7/11/2019 10:28:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007507
RECORD_ID
PR0544645
PE
3528
FACILITY_ID
FA0004979
FACILITY_NAME
CIVIC CENTER PARKING*
STREET_NUMBER
141
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909002
CURRENT_STATUS
02
SITE_LOCATION
141 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> r — SECOND QUARTER 1994 SEWER DISCHARGE REPORT <br /> GROUND WATER PUMPING SYSTEM WITH DISCHARGE TO SEWER <br /> C M WEBER ENTERPRISES <br /> 141 N EL DORADO STREET,STOCKTON CA <br /> I � <br /> McnitorincY Time Ground Pumping Discharve■ Total• Total Dtsch*rassampilEm Point Concentrations in micronimsPoter <br /> Sampling Water Welts to Sewer %wmeter to Sower Sewer Discharge <br /> Date Svotem Readina IcLallons) I sarneiing Constituents german. Tduww otal TPHO <br /> Status (gallons) I Comments bartzerle <br /> 3/2/93 ON RW-1 & RW-2 91 0 <br /> 3/18/93 ON RW-1 & RW-2 7 9 209.508 209 608 8TEX TpHa, TTO 16 20 33 120 510 <br /> lTotal Cadnnmi Lead Nickel Silver Zinc <br /> 4/8193 ON RW-1 & RW-2 7 6 "1.347 441,34 7 BTEX TPHg 17 42 48 180 660 <br /> 4127/93 4 30 PM ON RW-1 &RW-2 75 $43,729 643,729 BTEX TPH 19 38 67 220 970 <br /> 5/11193 10.30 AM ON RW-1 & RW-2 735 790 744 1 790 744 BTEX TPHa 12 42 65 220 830 <br /> 5126/93 5.10 PM ON RW-1 & RW-2 9 25661(n - 973 344•••1 BTEX TPHg 181 53 74 270 980 <br /> heft deed I <br /> a/10/931 10 50 AM ON RW-1 & RW-2 8421 1 138,6211 STEX TPHC 23 54 98 340 1 300 <br /> flowmeter batteryreplaced at 10 40 am Total 0 <br /> a/231931 8 53 AM ON RW-1 & RW-2 8 58 159,8451 1 298468 $TEX MHI 61 95 350 1,300 <br /> (f lowmeter ttery replaced at 8 53 am Total = 0 <br /> 7/6193 3 30 PM ON RW-1 &RW-2 9681 160,628 1 459 094 BTEX TPHa 23 47 87 340 1 100 <br /> • 7/20/93 11 IOAMI ON RW-1 & RW-2 8371 333,938 1 632,402 1 STEX TPHa 18 30 71 2801 400 <br /> 8/3/93 12:05 PM ON RW-1 &RW-2 9091 514,851 t 813,317 BTEX TPH 16 31 79 300 1 400 <br /> 8117/93 7 35 AM ON RW-1 & RW-2 863 688.092 1 986 558 8TEX TPH 14 22 70 260 1 000 <br /> 911/93 11 40 AM ON RW-1 & RW-2 gas 879,359 2. 77,825 STEX TPH TTO 21 23 77 270 1 300 <br /> Total Cedmiuei Lead Krlret Suver Zinc <br /> 9/14193 9 38 AM ON RW-1 & RW-2 802 1 073 760 2 372 226 STEK TPN 14 20 76 250 1 200 <br /> 1017/93 4.10 PM ON RW-1 &RW-2 724 1,258,715 2.55 7181 BTEX TPH <br /> 10/7193 4 17 PM ON flowmeter trerV replaced at 4 17 pm Total = 0 <br /> 10/7/93 5 15 PM ON RW-1 &RW-2 8 941 398 2.557,5 79 BTEX TPHa 1418 60 230 _ 960 <br /> 10121/931 11 20 AM ON RW-1 &RW-2 9041 170,916 2 734 097 BTEX TPHa 15 19 59 220 1,000 <br /> 11/4/931 8 15 AM ON RW-1 & RW-2 9 61 3619.968 2r92 14918TEX TPHg 15 13 61 210 990 <br /> 11/18/931 11 45 AM ON RW-1 & RW-2 9 76 3,119,701 STEX TPHq 12 54 41 150 650 <br /> 1212/93 9 05 AM ON RW-1 & RW-2 9 63 3 313 688■■'•"18TEX TPH 7-4 17 43 180 700 <br /> 12/16193 8 30 AM ON RW-1 & RW-2 771 3,488,183-••■• STEX TPHg 16 14 94 340 —1500 <br /> 1/7/94 10 12 AM ON RW-1 & RW-2 7 09i 0.....• 3,574,5 10•'•■•i STEX T-PHC 10 83 61 180 890 <br /> 1120194 3 11 PMi ON RW-1 & RW-2 6981 134,5201 3 809 030 STEX TPHg 82 4 6 48 140 790 <br /> 3/2/94 3 13 PM ON RW-2 3381 460,3171 4,134,8471 <br /> 3/2/94 3 17 PM ON RW-2 (flowmetor ttery replaced at 3 17 om Total = 0) <br /> 4/5/94 9 25 AM ON RW-2 2341 91,1181 4 225 965 BTEX TPHa, TTO 0106 --j251 631 78 2001 1,200 <br /> ITatal Cadrmum g2pM,Lead Kdcai Silver,Znc I i <br /> 7/11/94 8 25 AM ON RW-1 & RW-2 591 250 828 a a76 7931BTEX TPH 2 41 61 <O 5 <0 51 <50 <br /> Notes I I I I <br /> 1) Ground water recovery s tsm operation commenced on 3/2/1993 , I <br /> 21 Existing sari venting system ISVE) o ration commenced on 6/23/1993 after replacement of granular activated carbon(GAC) SVE shut down on 9/21/93 pandina carbon <br /> r SVE raetartad an 1114/93 after GAC r sce-mm and dnMdovn an 1127/94pmemin GAC re0oceffam SVE raw! nod an 3121/84 atter GAC r scent" I <br /> 31a pm gallons per minute <br /> 41 BTEX = benzene toluene eth benzene total xyiensa I s <br /> 5)TPHg total F2trcleum h rocarbons as esohne I <br /> 6) " Flowmeter/totalizer reading f i <br /> 11 <br /> 7) TTO - total toxic organics <br />. 8) ■•Pum i rats calculated b 'bucket and stopwatch method' (average of 6 trials to fill u a 5 adt) <br /> on bucke <br /> 91 *Battery on flow meter dead Batts will be re ed dun next site visit Total discharge calculated b avers m pumping rates on 5/11 and 5/26/93 i <br /> 10) •''•Cis 1 2-Dichloroethene Eth benzene Tnchlomethdone Yin chlonds Na thetene Total X nss Toluene 2-Math na thaiene above laboratorymethod detection <br /> Ixrnts However,the TTO concentration is less than the nnit dtscha s limit of 4 57 m /I I <br /> 11) "■'•Calculated based on average pumping rates for the referenced month <br /> 12 m <br /> '•"•■Reset flowmeter Totalizer = O I <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.