My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007508
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
141
>
3500 - Local Oversight Program
>
PR0544645
>
ARCHIVED REPORTS XR0007508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 12:26:02 PM
Creation date
7/11/2019 10:28:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007508
RECORD_ID
PR0544645
PE
3528
FACILITY_ID
FA0004979
FACILITY_NAME
CIVIC CENTER PARKING*
STREET_NUMBER
141
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909002
CURRENT_STATUS
02
SITE_LOCATION
141 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> �BRn <br /> �l FUGRO WEST, INC. <br /> 1050 Melody Lane,suite 160 <br /> Rosevilla California 95678 <br /> Te[ (916)782-2110 <br /> FAX (916)786-7830 <br /> May 4, 1994 <br /> Mr Lynn Walker <br /> Shell Oil Company <br /> Post Office Box 5278 <br /> Concord, California 94520 <br /> Subject First Quarter 1994 Groundwater Monitoring and RemedlationStatus Report <br /> Former Shell Service Station (WIC No 204-7524-1509) <br /> 141 N EI Dorado, Stockton, California <br /> Dear Mr Walker <br /> Fugro West, Inc (Fugro), is pleased to provide Shell Oil Company the attached <br /> information documenting the results of quarterly groundwater monitoring, conducted on <br /> February 15, 1994, at the subject site by Blaine Tech Services, Inc , of San Jose, <br /> California <br /> Groundwater recovery/sewer discharge and soil venting system with granular activated <br /> carbon (GAC) emissions control are currently in operation The groundwater recovery <br /> system operation (pumping from wells RW-1 and RW-2) commenced on March 2, 1993 <br /> The venting system operation (extraction from VEW 1, VEW-2, VEW-3, and VEW-4) <br /> commenced on June 23, 1993 Remediation system monitoring is being performed per <br /> regulatory requirements The venting system operation was shut down between <br /> September 21 and November 4, 1993 due to replacement of spent GAC The venting <br /> system operation was shutdown again between January 27 and March 17, 1994 due to <br /> replacement of spent GAC <br /> Fugro performed groundwater effluent monitoring according to the sewerdischarge permit <br /> issued by the City of Stockton Municipal Utilities Department The sewer discharge <br /> permit was renewed for 1994 with quarterly sewer discharge sampling and monitoring <br /> requirements Sewer discharge results since system startup in March 1993 are included <br /> as Attachment 3 During the period between March 2, 1993 and April 5, 1994, an <br /> estimated 4,225,965 gallons of ground water containing dissolved hydrocarbons were <br /> pumped from RW-1 and RW-2 and discharged into the sewer <br /> 23-MIDQMR U S operating companies in California, Louisiana, Missouri, and Texas <br /> International operating companies in Australia Belgium, Brunei, Canada, Germany, Hong Kong, Indonesia, Japan, <br /> Malaysia, The Netherlands, Saudi Arabia, Singapore, United Kingdom, and United Arab Emirates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.