Laserfiche WebLink
y , i <br /> SHELL WELL MONITORING DATA SHEET <br /> Project #. 1 q 0 Z V -_� Z_ wV li . 2 r 1 7r 4 y4 001 <br /> Sampler: 5 ' Date: VI 6`q <br /> Well I.D.: - Well Diameter: 2 3 4Q 6 S <br /> Total Well Depth: 84'3L- Depth to Water: (-7, S' <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: vc Glade D.O. Meter (if req'd): _ Sl HACH <br /> Well Diameter Multiplier Well Diameter Multi oiler <br /> 2" 0 16 Y 102 <br /> 3" 037 6" 147 <br /> 4" 065 puler radms2 a 0 163 <br /> Purge Method Bailer Sampling Method Bailer <br /> N iddleburg Extraction Po <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> 70. 0 X o, ,n Gals <br /> ® I Case Volume(Gals} Speczfied Volumes Calculated Volume <br /> Time Temp(°F) pH pCond. Turbidity Gals. Removed Observations <br /> (Z S1 6s,3 7"6 9 ?_C7 Z j <br /> Z " 0,0 7,5-- 9R-0 z o <br /> Z s5- 7cl loo t 60 r-) <br /> Did well dewater? Yes N Gallons actually evacuated. 60, V <br /> 6� <br /> Sampling Time: 3 Sampling Date: I1 Z61 <br /> Sample I.D Laboratory: Sequot BCA <br /> Analyzed for: H- Bip TPH-D Other: <br /> Equipment Blank LD : @ r�� Duplicate I D <br /> alyzed for- TPH-G BTEX MTBE TPH-D Other <br /> D.O. (if req'd): Pre-purge �, mg/L Post-purge- �, mg/L <br /> O.R. P (if req'd) Pre-purge mV Post-purge. mV <br />