My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
222
>
2900 - Site Mitigation Program
>
PR0009146
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:00:36 PM
Creation date
7/11/2019 11:17:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009146
PE
2960
FACILITY_ID
FA0004093
FACILITY_NAME
LIGHTHOUSE SCHOOL
STREET_NUMBER
222
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13910022
CURRENT_STATUS
02
SITE_LOCATION
222 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Respirator Fit Testing Results.) <br /> • Overseeing the air monitoring procedures as they are carried out by the site <br /> personnel for compliance with all company health and safety policies. <br /> • Knowledge of emergency procedures, evacuation routes and the telephone <br /> numbers of the ambulance, local hospital, poison control center, fire and <br /> police departments. <br /> • Ensuring that all project-related personnel have signed the personnel <br /> agreement and acknowledgments form contained in this site safety plan. <br /> • Coordinating upgrading and downgrading PPE with the Project Manager, <br /> as necessary, due to changes in exposure levels, monitoring results, weather <br /> and other site conditions. <br /> • Performing air monitoring with approved instruments in accordance with <br /> requirements stated in this Health and Safety Pian. <br /> Other Project Field Staff: <br /> Responsibilities include: <br /> • Adherence to this HASP during all field activities. <br /> • Communicating its requirements to subcontractors and ensuring their <br /> compliance. <br /> • Informing the FSS,and the project manager of any health or safety related <br /> questions or issues that arise in the course of the field work. <br /> Subcontractors: <br /> Responsibilities include: <br /> • Adherence to this HASP during all field activities or to more stringent <br /> requirements imposed by their own guidelines. <br /> • Submission of documentation for training, medical surveillance and <br /> respirator fit testing requirements to the FSS prior to initiation of on-site <br /> activities. <br /> Santochi&Bravante LLC American Savings Bank <br /> 20 Corporate Plaza 9620-041-1 <br /> Newport Beach,California 5 222 E1 Dorado <br />
The URL can be used to link to this page
Your browser does not support the video tag.