My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
222
>
2900 - Site Mitigation Program
>
PR0009146
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:00:36 PM
Creation date
7/11/2019 11:17:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009146
PE
2960
FACILITY_ID
FA0004093
FACILITY_NAME
LIGHTHOUSE SCHOOL
STREET_NUMBER
222
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13910022
CURRENT_STATUS
02
SITE_LOCATION
222 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project personnel shall bring to the attention of the designated FSS any unsafe condition <br /> or practice associated with on-site project-related activities. <br /> All boring, excavation, heavy equipment operation and general construction activities shall <br /> be performed in compliance with 29 CFR 1926. <br /> All project personnel who are required to wear purifying or air supplied respirators must <br /> first meet the training and medical requirements of 29 CFR 1910.120 and 20 CFR <br /> 1910.134. <br /> No contact lenses may be worn within 20 feet of drilling activity ("hot zone"). <br /> 7.1 Control of Work Area <br /> Prior to the start of work the work area shall be controlled to reduce the possibility <br /> of injury to workers or pedestrians. Control of the area will be accomplished by, <br /> but not limited to, the following: <br /> Setting up physical barriers to exclude unnecessary personnel from the area and <br /> posting appropriate signage. <br /> Establish the working zones (Exclusion Zone, Support Zone and Clean Zone) <br /> within the work site. <br /> Minimize the number of personnel and equipment in the work area consistent with <br /> effective operations. <br /> Establish control points to regulate access to work zones. <br /> Prior to the start of work each shift, the FSS shall conduct an inspection of the <br /> devices used to control the work area. (See Appendix F, Site monitoring Log.) <br /> 7.2 Drill Rig Safety Guidelines <br /> Drill rig maintenance and safety is the responsibility of the drilling operator. The <br /> following information is provided as general guidelines for safe practices on the <br /> site: <br /> • No food or beverage will be consumed or stored in the operational area. <br /> • The route of travel before moving the drill rig off-road should be inspected. <br /> Rocks, trees, erosion, power lines and uneven surfaces should be noted. <br /> • No passengers shall be permitted in the cab while moving the drill rig into <br /> Santochi&Bravante LLC American Savings Bank <br /> 20 Corporate Plaza 9620-041-1 <br /> Newport Beach,California 8 222 El Dorado <br />
The URL can be used to link to this page
Your browser does not support the video tag.