Laserfiche WebLink
a) in excess of 50 ppm for periods exceeding 15 minutes (breathing <br /> zone). <br /> b) In excess of 15 ppm for 30 minutes (breathing zone). <br /> ' 9.2 Air Sampling Protocol <br /> Previous environmental investigations indicate the possibility of volitule organic <br /> l,1 compounds such as BTEX and petroleum hydrocarbons. In the event air monitoring <br /> with a combination oxygen/combustible gas meter becomes appropriate, alarms shall <br /> be set at 19.5% oxygen, 25% LEL. The teeter is to be set up with an extension probe <br /> ' or a length of Tygon tubing to allow sample to be drawn immediately adjacent to <br /> borehole. <br /> The following air/physical monitoring shall be conducted when the exclusion <br /> zones are occupied. When more than one exclusion zone exists at the same <br /> ' time (not anticipated), spot readings at all occupied exclusion areas shall be <br /> performed on a rotating basis. <br /> ' PID readings: Organic vapor monitoring shall be performed at the breathing <br /> zone and boreholes every 60 minutes initially, and every 15 minutes thereafter <br /> if vapors are detected. <br /> • Personal sampling for metals, organic vapors, etc. may be required at the <br /> discretion of the FSS. <br /> ' 9.3 Equipment Calibration and Maintenance <br /> ' Oxygen/Combustible gas meters shall be calibrated daily against a cylinder of <br /> calibration gas of a suitable concentration, such as 25% LEL. <br /> ' The PID shall be calibrated daily against isobutylene span gas and "zeroed" against <br /> organic-free zero air. Background levels measured at the site shall be noted daily, and <br /> used daily, as a baseline for detecting excursions during monitoring. <br />' All instruments shall be charged and maintained <br /> g as specified In their respective <br /> instrument manuals. This will be the responsibility of the FSS. <br /> t9.4 Documentation <br /> tThe Site Monitoring Log (Appendix F) shall be used to document all air monitoring <br /> data. This log shall be used to record the following: <br /> • Instrument calibrations <br /> Work zones established each day - list location and activity for each. <br />' CRC Environmental Risk Management,Inc. <br /> B Project#2100-250-2 <br /> American Savings Bank <br /> April 6, 1995 222 North El Dorado Street <br />' <br /> 2� Stockton,California <br />