My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011669
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
222
>
2900 - Site Mitigation Program
>
PR0009146
>
ARCHIVED REPORTS XR0011669
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:18:47 PM
Creation date
7/11/2019 11:26:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011669
RECORD_ID
PR0009146
PE
2960
FACILITY_ID
FA0004093
FACILITY_NAME
LIGHTHOUSE SCHOOL
STREET_NUMBER
222
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13910022
CURRENT_STATUS
02
SITE_LOCATION
222 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clayton <br /> EM,iRO %mE�ia, <br /> :O\5LL'4�'S <br /> DRILLING, WELL CONSTRUCTION AND <br /> SAMPLING PROTOCOLS <br /> FOR <br /> BOREHOLE/MONITORING WELL INSTALLATION <br /> BOREHOLE INSTALLATTnN <br /> Clayton Environmental Consultants, Inc, acquires the proper governmental agency permits to <br /> bore, drill, or destroy all proposed boreholes and monitoring wells that intersect with <br /> groundwater aquifers and writes a health and safety plan. <br /> Clayton subcontracts only with drillers who possess a current C-57 water well contractor's <br /> license issued by the State of California and whose personnel have attended the OSHA 40- <br /> hour Hazardous Materials Safety Training. Prior to starting work, a "tailgate" safety meeting <br /> including discussion of the safety hazards and precautions relevant to the particular job will <br /> be held with all personnel working on the job. Well drillers are identified on permit <br /> applications. <br /> Borings are drilled dry by hollow- or solid-stem, continuous flight augers. Augers, drill rods, <br /> and other working components of the drilling rig are steam-cleaned before arriving onsite to <br /> prevent the introduction of contaminants. These components are also steam-cleaned <br /> between borings away from boring locations. Cleaned augers, rods, and other components <br /> are stored, and/or covered when not in use. <br /> Our bore logs include a detailed description of subsurface stratigraphy. Clayton examines the <br /> soil brought to the surface by drilling operations, and samples undisturbed soil every 5 feet or <br /> as otherwise specified. Soil cuttings are screened for hydrocarbon contamination using a <br /> photoionization detector. Boring logs are billed out in the field by a professional geologist, <br /> civil engineer, engineering geologist who is registered by the State of California, or a <br /> technician who is trained and working under the supervision of one of the previously <br /> mentioned persons, using the Unified Soil Classification System. <br /> SOIL SALMPLTNG <br /> Soil samples are taken every 5 feet, at areas of obvious contamination, or as otherwise <br /> specified, with a California modified split-spoon sampler that is lined with three six-inch brass <br /> tubes. The sampler and rod are inserted into the borehole to the current depth and a <br /> hammer of known weight and height above the sampler are allowed to free-fall onto the rod, <br /> advancing the assembly 18 inches into undisturbed soil. Clayton uses the number of blows <br /> necessary to drive the sampler into the ground to help evaluate the consistency of materials <br /> encountered. The sampler is then pulled from the borehole and disassembled, and the three <br /> brass tubes are separated for inspection and labeling. <br /> Clayton uses new brass liners or liners cleaned with a trisodium phosphate (TSP) solution, <br /> double rinsed with clean tap water, and air dried prior to each sampling. The sampler is also <br /> cleaned with TSP and rinsed with tap water between sampling events. <br /> PrwcmLrep <br />
The URL can be used to link to this page
Your browser does not support the video tag.