My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
308
>
3500 - Local Oversight Program
>
PR0544650
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 1:54:53 PM
Creation date
7/11/2019 11:52:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544650
PE
3528
FACILITY_ID
FA0003520
FACILITY_NAME
DENS AUTO REPAIR INC
STREET_NUMBER
308
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
149063301
CURRENT_STATUS
02
SITE_LOCATION
308 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> Messrs Larson and Trommer May 10, 2011 <br /> 308 EI Dorado Street S, Stockton, CA Page 2 of 2 <br /> Mw-1A <br /> 100000 20 <br /> 25 <br /> 10000 <br /> 30 <br /> CL 1000 35L$ DTW <br /> MW <br /> N <br /> C Benzene <br /> 0 <br /> m 1,2 DCA <br /> m 40 eet <br /> v <br /> 0 100 <br /> U <br /> 45 <br /> 10 <br /> 50 <br /> 1 55 <br /> 01 A� 01 AP ASO A� P SP -S <br /> 411 �011 <br /> 411 49 yeQ �eQ 1 e 10 �eQ <br /> Sampling Dates <br /> Four water supply wells within 500 feet of the site have been identified by drillers' logs or visually, <br /> which should be further clarified to evaluate the risk and hazard posed by the plume of impacted <br /> groundwater. The EHD has recently approved preparation of a corrective action :plan for the site. <br /> Based on the contaminant concentration trends and levels in the source area, it is the opinion of <br /> the EHD that work should continue on the corrective action plan for possible implementation. <br /> As it is very difficult to get work done.on a site once the CUF recommends that the-site be closed, <br /> the EHD requests you to reconsider or delay your closure recommendation while the EHD <br /> addresses the issues noted above. While the CAP is in preparation and monitoring of the new <br /> wells is completed for a hydrologic cycle, the EHD will consider site for closure and will direct <br /> submission of an HHRA, a.vapor intrusion evaluation, verification of the presence and sampling of <br /> any nearby water supply wells, and a projection of the time requiredto achieve WQOs. <br /> Questions or comments should. be directed to Vicki McCartney at (209)'468-9852 or to Nuel <br /> Henderson at(209) 468-3436. <br /> Sincerely, / <br /> Victoria L. McCartney, REHS Nuel Henderson, PG <br /> Senior Registered Environmental Engineering Geologist <br /> Health Specialist <br /> 5-Year Review Letter Response 0511.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.