My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007588
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
308
>
3500 - Local Oversight Program
>
PR0544650
>
ARCHIVED REPORTS XR0007588
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 4:00:13 PM
Creation date
7/11/2019 1:04:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007588
RECORD_ID
PR0544650
PE
3528
FACILITY_ID
FA0003520
FACILITY_NAME
DENS AUTO REPAIR INC
STREET_NUMBER
308
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
149063301
CURRENT_STATUS
02
SITE_LOCATION
308 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i I <br /> I ,a r' ' -"_ I-r_ .� h c �rr..c __ - > � � 't- - _• � z -- •- - _ __ ., A 'I <br /> I <br /> � �Quarterly Report - Second Quarter 2004 <br /> '' yl DEN'S AUTO REPAIR <br /> I I - 308 South El Dorado Street, Stockton, California <br /> I I, <br /> I, 1.0. INTRODUCTION <br /> At,the 'request of Mr,Den Ueda, Advanced GeoEnvironmental, Inc (AGE) has prepared this <br /> quarterly report for the property located at 308 South El Dorado Street, Stockton, California(site) <br /> The scope of work included conducting a quarterly ground water monitoring event and preparation <br /> of this report The location of the site and the immediately surrounding area are illustrated on Figure <br /> 1, structures,former underground storage tank(UST)locations,and soil boring and monitoring well <br /> locations are illustrated on Figure 2 <br /> I ; Based on subsurface investigation to date,AGE has developed a hydrogeologic model consisting of <br /> `four informal units a vadose(unsaturated)zone and three hydrogeologic units(HU1 through HU3) <br /> I Hydrogeologic units were delineated based on soil types,hydraulic characteristics(e'g pore pressure <br /> and hydraulic conductivity) and vertical and lateral continuity <br /> I <br /> In general <br /> • HU1, extending from the vadose zone to approximately 45 feet below surface grade (bsg), <br /> 10 is comprised of silt and clay and characterized by predominantly high pore pressure <br /> • HU2,extending from 45 to approximately 90 feet bsg,is composed predominantly of silt and <br /> clay,with the lower contact on a sand layer with limited`gravel content(HU3) This interval <br /> is characterized by pore pressures varying from low to moderate <br /> HU3, extending from 90 feet bsg to the maximum depth of the soil borings, is comprised <br /> primarily of a sand layer with limited gravel conterit overlaid by silt and clay This interval <br /> is characterized by low pore pressure and may be classified as a flow unit, based on the <br /> extensive nature of the sediment There are no wells installed at the site to sample ground <br /> water from this unit <br /> P <br /> Site history and findings from previous investigations and monitoring events are provided in <br /> Appendix A y <br /> I `� <br /> 2.0. PROCEDURES <br /> This report was prepared in accordance with Central Valley Regional Water Quality Control Board <br /> (CVRWQCB) guidelines for the investigation of UST sites Ground water monitoring p'r`ocedures <br /> 'were performed as outlined in the AGE-prepared Site, Investigation Work Plan, dated <br /> 05 February 1996 <br /> Advanced GeoEnvironmental,Inc <br /> i <br /> I t <br /> t <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.