Laserfiche WebLink
I 1 <br /> 16 June 2003 <br /> AGE-NC Project No 95-0135 <br /> 4 r 1 <br /> Page 4 of 4 m ' <br /> I5.0. RECOMMENDATIONS <br /> F <br /> Based on the results of this and previous investigations, AGE recommends s <br />' 0 Continued quarterly monitoring of the site The next monitoring event should conducted In <br /> q Y g _ g <br /> Apn12003 <br /> • Installation of the additional ground water monitoring wells, previously approved <br /> I Once the impact to soil and ground water impact has been delineated, a work plan should be <br /> prepared for feasibility testing to evaluate various remedial alternatives at the site <br /> 6.0. LIMITATIONS <br /> f I r <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar,localities The findings were based on <br /> analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a lnrruted number of <br /> available data points (z e ground water samples) and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> interpretations, opinions and recommendations contained in this report <br /> ' e = T <br /> I <br /> I <br /> F I i <br /> J <br /> 7 ++ <br /> ' I 1 <br /> ti <br /> I , , <br /> I � <br /> S � <br /> { III I 4 <br /> e <br /> r r F r <br /> r <br /> •r r I a I , U CJI E r r <br /> I I I <br /> Advanced GeoEnvironmental,Inc <br /> I . <br /> I <br /> k <br /> i f <br />