Laserfiche WebLink
,. 28 February�2003 <br /> AGE-NC Project No 95-0135 <br /> Page 4 of 4 <br />' Based on the results of this and previous investigations, AGE recommends <br /> " • Contmued'quarterly monitoring of the site The next monitoring event should conducted in u' <br />' Apn12003 <br /> • Installation of the additional ground water monitoring wells, previously approved <br />' Once the impact to soil and ground water impact has been delineated, a work plan should be <br /> prepared for feasibility testing to evaluate various remedial alternatives at the site <br /> 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> P P g �' , <br /> environmental consultants practicing in this or similar localities The findings were based on analytical <br />' results provided by an independent laboratory Evaluations ofthe hydrageologic conditions at the site <br /> for the purpose of this investigation are made from a limited number of available data points (i e <br /> ground water samples) and subsurface conditions may vary away from these data points No other <br /> warranty, expressed or implied, is made as to the professional interpretations, opinions and <br /> recommendations contained in this report <br /> 1 <br /> t <br /> 1 Advanced GtoEnvironmenta4 Inc <br />