Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Fsitewas prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices Qnitoap*ventpi�ing 7)_d ices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monit ri e -disp 6hc17 6ntalri 1 (�) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. ,, <br /> MonitoriopSystem CerUfloation UST Monitoring Site Plan NOV 6 2018 <br /> sitea_ddres CHEROKEE LANES SERVICE 900 CHEROKEE LANE LORI CA 95240 i <br /> HEALTH <br /> 1='ARTM� �lT <br /> . . . . . . . . . . . . <br /> - - - - - - . . . . . . . - - <br /> 5 . . . 1 , 7' • • • . - . - - - • • - • - • . - SAT, - 9 . . 10- <br /> - . . DSL QtlLY,:,. <br /> Fim <br /> \- p O .t <br /> BLDG . T <br /> iT . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . _ . . . +PmriG } <br /> KEY . . . . - - - - . . . . (ARROWS) <br /> A= APLNIMAR . . . . . . . . . . - - Dratvmz of piping <br /> F = FILLS . . - . . . . . . - - - exit of suanp and <br /> T = TUMINE . . . . . . . . . . - - - UDC's. 'o <br /> P = PROBE . . . . . underground <br /> V = VAPOR dkanmig i <br /> X = SUA� SPSlSOR ennnaaccurate, the <br /> L = Leak Detector _iris• irenu rnai:-rgrornairlreearr nor risible ro dor cert 6ingrxlariclarra-e a bhm pt speculate_ <br /> AI =Afanty s blueprint. <br /> e. ya-ofessietzrloplracarars?t• arrlarssdehfa- irjfonrnrlarzilpnprc�_ Drm ,•irg <br /> B = Brine Sensor swiloscde <br /> I = Snort Sensor - <br /> S — STP <br /> C = Floats & L"hains Date map was dravin- 10126117 _ <br /> E = E Stop <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System CemaCccatiom On your site plan, <br /> show the general layout of tanks and piping. Clearly identify tocatons of the following equipment, if installed_ monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared <br /> LEGEND <br />