My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
325
>
3500 - Local Oversight Program
>
PR0544652
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 8:30:26 PM
Creation date
7/11/2019 1:34:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544652
PE
3528
FACILITY_ID
FA0012146
FACILITY_NAME
GATEWAY PROJECT
STREET_NUMBER
325
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14906112
CURRENT_STATUS
02
SITE_LOCATION
325 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r :�A -_.a- ''�.. <br /> FILE COPY <br /> CHRONOLOGY <br /> 1 <br /> CITY OF STOCKTON GATEWAY PROJECT <br /> 325 S . ELDORADO AVENUE <br /> STOCKTON CA 95205 <br /> 09/20/99 Tank#2 discovered on site during demolition activities. <br /> 10/08/99 Tank#2 removed this date under permit and inspection by San <br /> Joaquin County Environmental Health Division (PHSIEHD). <br /> Contamination noted, soil samples collected. <br /> 10/18/99 Report of tank removal activities, TPHg and TPHd reported <br /> beneath the east end of the tank. <br /> 10/29/99 Prop 65 #99-138 filed this date. <br /> 01/07/00 Site entered into Local Oversight Program. <br /> 01/11/00 NOR sent to City of Stockton Redevelopment Agency. <br /> 03/10/00 Work Plan for initial investigation submitted this date. <br /> 03130100- Beginning investigation, five geoprobe soil borings advanced, soil <br /> 03/31/00 and grab.groundwater samples collected for analysis. <br /> 04/25/00 Investigation report submitted to PHSIEHD. Minor petroleum <br /> hydrocarbon contamination noted in soil to 26-feet bsg andin <br /> groundwater sample collected from boring B-1 (located in former <br /> tank pit). In boring B-5 the soil sample from 24-feet bsg had .13- <br /> ppm TPHmo. <br />
The URL can be used to link to this page
Your browser does not support the video tag.