My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
325
>
3500 - Local Oversight Program
>
PR0544652
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 8:21:46 PM
Creation date
7/11/2019 1:35:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544652
PE
3528
FACILITY_ID
FA0012146
FACILITY_NAME
GATEWAY PROJECT
STREET_NUMBER
325
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14906112
CURRENT_STATUS
02
SITE_LOCATION
325 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'WORK PLAN <br /> SOIL-AND GROUNDWATER SAMPLING - - <br /> - BY DIRECT PUSH GEOPROBE <br /> Gateway Project,Portion of Block 37 <br /> _ V�7 City of Stockton <br /> March 10,2000 <br /> I. INTRODUCTION ry <br /> - This work plan was prepared.,by Condor Earth Technologies, Inc. (Condor)-to describe..-,soil and <br /> groundwater investigation utilizing Geoprobe direct push technology at the Gateway Project, Stockton, <br /> California.,The site 'is located south of Lafayette Street between El_Dorado Street and Center Street-in <br /> Downtown Stockton:''.Thc:.purpose'of the'proposed limited subsurface investigation is to evaluate the <br /> .o .. iE s _ <br /> . . p petroleum hydrocar_�on contamt�iatton`in soil and/or-groundwater.related to one or more. <br /> �- <br /> potential for etrole .- . <br /> - underground storage tanks (USTs) formerly located at the site. This work plan was prepared at the <br /> request of Mr. Ron 1 almquist of the'City of Stockton; Ms. Suzanne Sullivan of Suzan ne Sullivan.Real. <br /> Property Services,and Ms.Deedee Antypas of Siegfried.Engineering;Inc. (Siegfried). <br /> L <br /> All work conducted by Condor_wilfµ a under,thei` upervision of a California Registered Geologist. This _ <br /> work plan includes project background information, a description'of the field, laboratory and reporting <br /> procedures proposed'to conduct the work,'and a project schedule: <br /> 2. PROJECT BACKGROUND - <br /> The site contained two underground storage tank (UST}sites associated with past uses of the site, and it , <br /> is believed that at least one tank has leaked in the'past. The two tanks were located immediately'adjacent <br /> to El Dorado Street approximately midway between Lafayette and the existing structure fronting Sonora <br /> Street. The scope of work described in this work planwas-preparedin accordance with the approved:: <br /> work order received by Condor on February 28,`2000. After the receipt of the work order, Condor met- _ <br /> with Ms. Deedee A,itypas},at the prajectysite.to'�review the work performed to'-date, 'and to mark the <br /> location of potential borings on El Dorado <br /> The work.. includes; subsurface 'investigation, laboratory testing, and preparation of a report...,We <br /> a =-: _ - <br /> understand that any notice of site-contamination to other regulatory agencies will be the responsibility of 4. <br /> the City of Stockton.—".. -. <br />
The URL can be used to link to this page
Your browser does not support the video tag.