My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
325
>
3500 - Local Oversight Program
>
PR0544652
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 8:21:46 PM
Creation date
7/11/2019 1:35:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544652
PE
3528
FACILITY_ID
FA0012146
FACILITY_NAME
GATEWAY PROJECT
STREET_NUMBER
325
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14906112
CURRENT_STATUS
02
SITE_LOCATION
325 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Work Plan-.Sail and Groundwater Investigation <br /> = a y <br /> L`i tewa Project City of Stockton <br /> '» .» 'March 10 2000 µ <br /> M1 - Page-6- :. <br /> 5. PROJECT SCHEDULE <br /> TM Upon approval of this workpian by the City of Stockton and Siegfried,the field portion of the investigation <br /> 72, <br /> can be completed within approximately two to four.weeks. The turn-around tune for laboratory analyses is <br /> 12. <br /> approximately two weeks.A report can be submitted within two weeks of receipt of the laboratory analyses. <br /> If you need additional information or have any questions,please-call us at(209)234-051..8. <br /> IL - - <br /> w . Respectfully submitted, - <br /> CONDOR EARTH TECHNOW <br /> y� Off, <br /> Qr <br /> DONALD F.KiESSE <br /> -NO.643D <br /> Donald F. Kresse 4P�, Ron Skaggs <br /> California Registered'! Division Manager <br /> Geologist#6430 0 CAL <br /> Y- T <br /> P:12895 Stockton Gateway Project\Work Plan\2895 Gateway Project-Work Plan-doc <br /> ti- <br /> N� <br /> t a <br /> CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.