Laserfiche WebLink
5. Air dry. <br /> Drill augers will be steam-cleaned before each boring is drilled. <br /> Management of Drill Cuttings and Wastewater <br /> Soil cuttings and wastewater will be placed in 55-gallon drums that meet U.S. Department <br /> of Transportation specifications and stored on site pending the results of the laboratory <br /> analyses. Each drum will be labeled with the.'date and drum contents. Soil cuttings and <br /> wastewater will be transported off site for disposal after receipt of laboratory analytical <br /> results. <br /> Documentation Procedures <br /> Orion personnel will follow documentation procedures developed for site investigation <br /> work to provide a record of the activities performed in the field. Orion field personnel <br /> will be on site to supervise and observe ,the progress of each well removal and <br /> abandonment. <br /> r <br /> I <br /> i <br /> k 1 <br /> [S:\BFS\Stockton\WKP\W KP004.docI 11/13/01 <br />