My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
400
>
2900 - Site Mitigation Program
>
PR0506606
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 8:20:38 PM
Creation date
7/11/2019 2:15:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506606
PE
2950
FACILITY_ID
FA0007533
FACILITY_NAME
WASSERMAN FAMILY PARTNERSHIP
STREET_NUMBER
400
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13907009
CURRENT_STATUS
02
SITE_LOCATION
400 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRION - Orion Environmental Inc. <br /> 450 E.Spring St.,Suite 212 562 988-2755 PHONE <br /> Long Beach,CA go8o6 562 988-2759 FAX <br /> Q BOX 455 707 963-8982 PHONE <br /> 1 May 2001 Rutherford,CA 94573 707 963-8983 Fax <br /> Project No. 11 ST <br /> Mr. Harlin Knoll, Senior. REHS <br /> Site Mitigation Unit <br /> San Joaquin County Environmental Health Division <br /> 304 East Weber Avenue, Third Floor },;r <br /> i <br /> Stockton, California 95202 w <br /> E� Subject: Letter Report for Installation of an Additional Groundwater Monitoring <br /> Monitoring,Well, Groundwater M g, and Site Closure Request <br /> 400 North El Dorado Street,.Stockton; California <br /> PIN 127434 <br /> Dear Mr. Knoll: <br /> Bridgestone/Firestone, Inc.' (BFS) has retained Orion Environmental Inc. (Orion) to <br /> conduct groundwater assessment activities at the former BFS facility at 400 North E1 <br /> Dorado Street in Stockton, California (the site; Figure 1). This document summarizes the <br /> activities conducted in April 2001 to delineate the nature .and extent of impacted <br /> groundwater at the site. <br /> This report has been prepared in accordance with a meeting between BFS and Orion <br /> with the San Joaquin County Environmental Health Division (S)CEHD) and Central <br /> Valley Regional Water Quality Control-Board (RWQCB) on 7 March 2001 and Orion's <br /> Work Plan for Groundwater Assessment dated 23 March 2001 . During the subject <br /> meeting, BFS was requested to install one more groundwater monitoring well <br /> downgradient from the source area and sample for gasoline constituents. The following <br /> paragraphs provide a description of 'the site, summary of previous investigations, <br /> reporting of groundwater well installation and monitoring, revised mass calculation, and <br /> (r, rationale for site closure. <br /> Site Description <br /> The site is the former location of an automobile gasoline station that operated during the <br /> 1920's and 1930's. After this period the site was used as a retail tire and automobile <br /> service center: In 1967, four. underground storage tanks (USTs) were closed in place by <br /> F filling the tanks with sand. In 1991, one of these previously closed tanks was removed <br /> from the site along with eleven other USTs previously located at the site. The remaining <br /> tanks .include: Tank #1 and #3 (7,500-gallon capacity each) and Tank #2 (550-gallon <br /> capacity). <br /> i' <br /> ° SABFS\ST0CKT0N\LTR\LTR008.000 5/1/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.