Laserfiche WebLink
f <br /> IF <br /> 2.0 SCOPE OF WORK <br /> The scope of work for this site assessment includes the following tasks: <br /> ❑ Soil Boring, Sampling, and Well Installation: Soil borings may be drilled in various. <br /> locations'to evaluate soil lithology and collect soil samples. Borings will be drilled <br /> using hollow-stem auger or direct-push techniques. Borings will be drilled to total <br /> depths of 40 feet below grade and) soil samples will be collected from 5-foot <br /> intervals. Borings may be completed as monitoring wells. <br /> ❑ Groundwater Sampling_ Groundwater'samples may be collected from existing or <br /> new monitoring wells. The wells will; be purged of three to five casing volumes <br /> before sample collection. The iwater samples will be collected using' <br /> decontaminated Teflon bailers or disposable bailers. The samples will be placed in <br /> glass bottles and transported to the 'analytical , laboratory within 24 hours of <br /> collection. <br /> E <br /> SABFS\ST0CKT0N\HSP0011 10/15/99 2-1 <br />