Laserfiche WebLink
Firestone Store #3573 400 North El Dorado Street, Stockton, Caldorma <br /> October 25, 1995 VES Quarterly Report and Request for Closure-4589 Page 5 of 14 <br /> 33 Analytical Results/Trends <br /> Vapor stream sampling and analysis was performed weekly throughout SVES <br /> operation to identify the level of TPH-G and BTEX concentrations within the soil <br /> vapor, and to establish the trend of TPH-G and BTEX concentration reduction over <br /> time <br /> Laboratory analytical results from the first quarter of operation can be reviewed in <br /> the monitoring report sent to San Joaquin County on May 18, 1995 (First Quarter <br /> Monitoring Report, Appendix 7 6) Analytical results from the second quarter of <br /> operation are tabled in Section 2 0 of this report While all samples were analyzed <br /> for BTEX, benzene is the compound of primary regulatory concern, therefore it is <br /> the only BTEX compound for which concentration trends and residual levels have <br /> been evaluated The following evaluations of TPH-G and benzene concentration <br /> trends are based on laboratory results from Capitola Technologies <br />' 3 3.1 TPH-Gasoline <br />' The TPH-G Concentration Graph on Page 6 was created using a visual best-fit <br /> curve through the plotted data points As demonstrated by the curve, the <br /> maximum TPH-G level of 667 7-ppm (observed at startup on November 4, <br /> 1994) decreased rapidly over the first month of operation The TPH-G vapor <br /> concentration fell below 100-ppm in mid-December 1994 and remained below <br /> that level throughout the remainder of system operation <br /> TPH-G concentrations remained relatively stable (48 6-to 82 0-ppm)throughout <br /> the three month period from mid-December 1994 through the primary system <br /> shutdown on March 24, 1995 Since there is no discernable trend of TPH-G <br /> concentration reduction during this operational period, reduction of TPH-G <br /> concentrations in soil vapor is believed to have reached an asymptotic state <br /> during this time <br /> Fallowing the shutdown period for subsurface equilibration (March 24 through <br /> April 21 , 1995), the system was re-started to investigate for elevated VQC <br /> concentrations that may have resulted from the dormant period A sample <br /> collected during startup of the SVES following the shutdown period displayed <br /> a decreased TPH-G concentration of 27 1-ppm when compared with the pre- <br /> shutdown sample result of 56 9-ppm TPH-G results for the following three <br /> weeks remained below the pre-shutdown levels <br /> RYAN-MU UWY, INCORPORATED Denver <br /> Fnvu+oumenl Conshmetion Management Los Angeles <br />