Laserfiche WebLink
Firestone Tire and Rubber Company Page 5 <br /> Stockton, CA. , Work Plan <br /> SCHEDULE <br />' The following schedule is based on time after approval of the <br /> workplan by PHS- <br /> T 1 • Site Assessment : 2 weeks <br /> I 1 week mobilization (depends on availability of driller) <br /> 1 week on-site, sample analysis, and reporting <br /> Task 2 : Soil Excavation. 1 week <br /> I <br /> CLEAN-UP GOALS <br />' The Public Health Services, San Joaquin County' s clean-up goals <br /> are to have all laboratory analysis reported with non-detectable <br /> constituents. However, each site is handled on a case-by-case <br /> basis It is expected that once the soil, analysis have been <br /> reported, that future discussions will determine the site <br /> specific clean-up goals for this site <br /> I <br />