Laserfiche WebLink
Firestone Tire and Rubber Company <br /> Page 5 <br /> Stockton, CA. , work Plan <br /> SCHEDULE <br /> The following schedule is based on time after approval of the <br /> workplan by PHS : <br /> Til: Site Assessment 2 weekc <br /> 1 week mobilization (depends on availability of driller) <br /> 1 week on-site, sample analysis, and reporting <br /> Tisk „2 Soil Excavation 1 week <br /> CLEAN-UP GOALS <br /> The Public Health Services, 5g2_JO3W?r rpunty' s clean-up goals <br /> are to have all laboratory analysis reported with non-detectable <br /> constituents However, each site is handled on a case-by-case <br /> basis . It hatefutureddiscussionsthat once twillhe odetermineil ltheaseitebeen <br /> reported, t <br /> specific clean-up goals for this site. <br />