Laserfiche WebLink
TABLE OF CONTENTS <br /> Title Regulatory Reference Page <br /> Introduction 3 <br /> Professional Engineers Certification 40 CFR 1 12.3(d) 4 <br /> SPCC Plan Amendments 40 CFR l 12.5(b) 4 <br /> Management Approval 40 CFR 1 12.7 5 <br /> SPCC Plan Conformance 40 CFR 1 I2.7(a)(1) 5 <br /> Plan Deviation 40 CFR 1 I2.7(a)(2) 5 <br /> Physical Layout of Facility 40 CFR 112.7(a)(3) 5 <br /> Product and Storage Capacity 40 CFR 1 12.7(a)(3)(i) 5 <br /> Discharge Prevention Measures 40 CFR 1 12.7(a)(3)(ii) 6 <br /> Secondary Containment 40 CFR 112.7(a)(3)(iii) 7 <br /> Countermeasures for Discharge Discovery, <br /> Response and Cleanup 40 CFR l 12.7(a)(3)(iv)&(v) 7 <br /> Contact List 40 CFR 1 12.7(a)(3)(vi) 8 <br /> Information to be given to Contacts 40 CFR 1 12.7(x)(4) 8 <br /> Potential Equipment Failure& Secondary Containment 40 CFR I I2.7(b)&(c) 9 <br /> Contingency Plan 40 CFR 112.7(d) 9 <br /> Inspection and Recording 40 CFR 1 12.7(e) 9 <br /> Personnel, `braining for Discharge <br /> Prevention Procedures 40 CFR 112.7(f) 10 <br /> Site Security 40 CFR I i 2.7(g) 10 <br /> Conformance with other Applicable Requirements 40 CFR 112,70) 10 <br /> Onshore Nonproduction Facilities 40 CFR 1 I2.8(a) 1 I <br /> Facility Drainage 40 CFR I I2.8(b)(3)&(4) I I <br /> Bulk Storage Containers 40 CFR 112.8(c)(])&(2) 11 <br /> Periodically Test the Integrity of Aboveground Tanks 40 CFR 112.8(c)(6) I l <br /> "Tank Level Alarms 40 CFR 112.8(c)(8) 12 <br /> Leakage Response 40 CFR I I2.8(c)(10) 12 <br /> Mobile or Portable Containers 40 CFR 112.8(c)(I 1) 12 <br /> Buried Piping at Transfer Operations 40 CFR 1 l 2.8(d)(I) 12 <br /> Inspections for Transfer Operations 40 CFR I I2.8(d)(4) 12 <br /> Vehicle Entering Facility Warning 40 CFR I I2.8(d)(5) 12 <br /> Attachments <br /> L Substantial Harm Criteria <br /> 2. Discharge Report Form <br /> 3. Training Attendance Form <br /> 4. Site Plan-Facility Layout <br /> 5. Monthly and Annual Inspection Checklists <br /> 2 <br />