Laserfiche WebLink
STI SP001 Annual Inspection Checklist <br /> General Inspection Information: <br /> Inspection Bate: Retain Until Date: (36 months from inspection date) <br /> Prior Inspection Datc: Inspector Name: <br /> Tanks Inspected(ID#'s): <br /> Inspection Guidance: <br /> 3 For equipment not included in this Standard.follow the manufacturer recommended inspection/testing schedules and procedures. <br /> i The periodic ASI'Inspection is intended for monitoring the external AST condition and its containment structure.This visual inspection does not require a Certified Inspector. <br /> It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br /> Remove promptly upon discovery standing water or liquid in the primary tank,secondary containment area,interstice,or spill container.Before discharge to the environment, <br /> inspect the liquid for regulated products or other contaminants and disposed of it properly. <br /> In order to comply with EPA SPCC(Spill Prevention,Control and Countermeasure)rules,a facility must regularly test liquid level sensing devices to ensure proper operation <br /> (40 CPR I I2.8(c)(8)(v)). <br /> r (*)designates an item in a nem-conformancc status.This indicates that action is required to address a problem. <br /> Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in ASI'design,a Certified Inspector,ora tank manufacturer <br /> who will determine the corrective action.Mote the non-conformance and corresponding corrective action in the comment section. <br /> Retain the completed checklists for 36 months_ <br /> Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> "v Note: If a change has occurred to the tank system or containment that may affect the SPCC plan,the condition should be evaluated against the current plan <br /> requirement by a Professional Engineer knowledgeable in SPCC development and implementation. <br /> Item I Task Status Comments <br /> 1.0 Tank Containment <br /> i.1 Containment Check for: Yes* No ,NIA <br /> structure • Holes or cracks in <br /> contalnmcnt wall or <br /> `Icor <br /> • Washout <br /> • Liner degradation <br /> • Corrosion <br /> • Leakage <br /> Paint failure <br /> • Tank settling <br /> 2.0 Tank Foundation and Supports <br /> 2.1 Foundation Settiement cr Yes* No <br /> foundation washout? <br /> 2.2 Concrete pad Cracking or spalling? Yes* No NIA <br /> or ring wall <br /> 23 <br />