Laserfiche WebLink
Item Task Status <br /> 5.2`Jahv(-„ Check the condition of all Yes* : :No <br /> valves for leaks, <br /> corrosion and damage. <br /> 5.2.1 Anti-sl;)hon, Cycle the valve open and Yes : .No* 'N/A <br /> check and gate closed and check for <br /> valves proper operation. <br /> 5.2.2 Pressure Check for proper Yes No* NlA <br /> regulator valve operation.(Note that <br /> there may be small,1/4 <br /> Inch drain plugs in the <br /> bottom of the valve that <br /> are not visible by looking <br /> from above only) <br /> 5.2.3 Expansion Check that the valve is in Yes 'No* . NIA <br /> relief valve the proper orientation. <br /> (Note that fuel must be <br /> discharged back to the <br /> tank via a separate pipe <br /> or tubing.) <br /> 5.2.4 5oleno€d Cycle power to valve to :Yes No* N/A <br /> valves check operation. <br /> (Electrical solenoids can <br /> be verified by listening to <br /> the plunger opening and <br /> closing. If no audible <br /> confirmation,the valve <br /> should be inspected for <br /> the presence and <br /> operation of the <br /> plunger.) <br /> 5.2.5 Fire and a.Manually cycle the UYes CNo*E?-N/A <br /> shear valves valve to ensure <br /> components are moving <br /> freely and that the valve <br /> handle or lever has <br /> clearance to allow valve <br /> to close completely. <br /> b.Valves must not be Yes[7No*GN/A <br /> wired in open position. <br /> c.Make sure fusible GYes MNo*CN/A <br /> element is In place and <br /> correctly positioned. <br /> 25 <br />