Laserfiche WebLink
SAN J O A Q U N Environmental Health Department <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date- <br /> INTERSTATE TRUCK CNTR 2110 S Sinclair Ave, Stockton May 29,2019 <br /> - T <br /> Qualified Facility-Pier I <br /> 465 CFR 112,6[a][3]{iii] Overfill prevention for containers not provided,not described in Plan,or tested F V -R ICOS <br /> Qualified Facility-Tier li <br /> 501 CFR 112.6(a)(i), Tier II Qualified Facility Phan not certified by the owner or a PE,as required in V D R o COS <br /> 112.8 b <br /> 5172 CFR 112.6(b)(2) Tier II Qualified Facility Pian technical amendment not certified by the owner or a PE o V o R ❑COS <br /> 503 CFR 112.6(b)(3), Faflure to have a PE certify in writing alternative measures for a Tier I10 ualified Facility a V o R o CDS <br /> i 12.6(b)(4) <br /> SO4 I CPR 112.6(b)(4)(I) Failure of owner to assure that a PE makes all required attestations in a Tier II Plan n V o R z COS <br /> General Requirements for SPCC Plans <br /> 601GFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section a V a R o COS <br /> 602 CFR 112.7(a)(2) Plan fafled to discuss equivalent environmental protection,if applicable o V ❑R o COS <br /> 4563 CFR 112.7(a)(3) Failed to adequately describe the physical layout of the facility in the Plan n V o R p COS <br /> 604 CFR 112.7(a)(3)(i) Plan failed to include oil type and storage Capacity for each container o V ❑R o COS <br /> 605 CFR 112.7(a)(3)(if) Plan failed to adequately discuss discharge prevention measures,including routine handling a V D R o COS <br /> 606 CFR 112.7(a)(3)(lfi) Plan failed to adequately discuss facility drainage or drainage oontrols ❑V o R in COS <br /> 607 CFR 112.7(a)(3)(w) Plan failed to include countermeasures for discharge discovery,response and cleanup o V o R o COS <br /> 608 CFR 112.7(a)(3)(v) Pfan failed to address disposal methods for recovered materials n V o R e COS <br /> 600 CFR 112.7(a)(3vi), Plan failed to adequately contain procedures for reporting a discharge o V o R ❑COS <br /> 112.7 a4) <br /> 616 CFR 112,7(a)(5) Discharge procedures are not adequately addressed if the facil fty has no response plan u V o R o COS <br /> 611 CFR 112.7(b) Plan failed to include a descrlptton of potential equipment failure or provide equivalence 4 V o R D COS <br /> 612 GFR 112.7(c) Plan failed to include secondary containment,diversionary structures,or equip to prevent discharge o V o R D COS <br /> 613 CFR 112,7(c) Failure to provide appropriate seoondary containment,diversionary structures or equipment o V o R in COS <br /> 614 CFR 112.7(d) PE certified Plan failed to explain impracticability of oontainmentldiversionary structures o V o R o COS <br /> 615 CFR 112.7(d) Failure to perform integrity and leak testing when claiming secondary containment impracticability o V c R c COS <br /> 616 CFR 112.7(d)(1) Failure to prepare an oil spill contingency plan when claiming impracticability of structures o V ❑R o COS <br /> 617 CFR 112.7(d)(2) No written commitment of manpower,equipment,and materials to control and remove oil discharge ❑V o R o COS <br /> 618 CFR 112.7(e),112.8(0) Failed to keep records of procedures,inspections,or integrity tests for three years ■V ■R D.COS <br /> 6) <br /> 619 CFR 112.7(f)(1) Failed to train personnel on all discharge prevention details listed in this section ■V o R u COS <br /> 820 CFR 112.7(f)(2) Failed to designate a person accountable for discharge prevention o V o R o COS <br /> 621 CFR 112.7(f)(1) Failure to include In the SPCC Plan an adequate description of employee training c V ❑R o COS <br /> 522 CFR 112.7(f)(3) Failure to conduct complete annual discharge prevention briefings for oil-handfing personnel D V ❑R o COS <br /> 623 CFR 112.7(g) Plan failed to address security of site and valves,lock outltag out,and lighting ❑V n R o COS <br /> 624 GFR 112.7(g) Facility failed to implement security of site and valves,lock out/tag out,and lighting OV ❑R ❑C05 <br /> 625 CFR 112.7(h) Plan failed to adequately discuss facility tank car and tank truck loadinglunloading rack D V o R o COS <br /> 626 CFR 112.7(h)(1) Loading/unloading rack containment system not adequate to contain spilt I OV o R o COS <br /> FA0023082 PRO540743 SCO01 05!2912619 <br /> EHD 28-01 Rev.0 912 7120 1 8 Page 2 of 5 Abovagraund Petroleum Storage Act OlR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sicehd.com <br />