Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for American Crane Rental, Inc. as of August 27, 2019. <br /> Open violations from July 09, 2018 inspection <br /> Violation#612-Plan failed to include secondary containment,diversionary structures,or equip to prevent <br /> discharge. <br /> Secondary containment for the 55 gallon new oil drums was not addressed in the SPCC plan. . A facility shall <br /> provide appropriate containment and/or diversionary structures or equipment to prevent a discharge. The entire <br /> containment system, including walls and floor, must be capable of containing oil and must be constructed so that <br /> any discharge from a primary containment system will not escape the containment system before cleanup occurs. <br /> Immediately provide adequate secondary containment for all aboveground petroleum storage containers larger than <br /> 55 gallons. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 1 <br />