Laserfiche WebLink
Spill Prevention, Control and Countermeasure Plan <br /> Tesla Treatment Facility Page i of vii <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0 APPLICABILITY AND DEFINITIONS FOR ALL FACILITIES AND <br /> TYPES OF OIL [40 CFR§112.1 THROUGH 40 CFR CFR§112.6]____________________________________1 <br /> 1.1 Purpose------------------------------------------------------------------------------------------------------------------------- 1. <br /> 1.2 General Applicability Requirements [40 CFR§112.1]-----------------------------------------------1 <br /> 1.2.1 General Applicability [40 CFR§112.1(a)]------------------------------------------------------1 <br /> 1.2.2 Oil Storage [40 CFR§112.1(b)]----------------------------------------------------------------------- <br /> 1.2.3 Federal Agencies [40 CFR§112.1(c)]-------------------------------------------------------------2 <br /> 1.2.4 Oil Storage Capacity [40 CFR§112.1(d)]-------------------------------------------------------2 <br /> 1.2.5 SPCC Plan [40 CFR§112.1(e)]-----------------------------------------------------------------------2 <br /> 1.2.6 Clean Water Act Applicability [40 CFR§112.1(f)]______________________________________ 2 <br /> 1.3 Definitions [40 CFR§112.2]----------------------------------------------------------------------------------------2 <br /> 1.4 Requirements to Prepare SPCC Plan [40 CFR§112.3]----------------------------------------------2 <br /> 1.4.1 Facilities Operational On or Before August 16, 2002 [40 CFR§112.3(a)]---2. <br /> 1.4.2 Facilities Operational After February 18, 2005 [40 CFR§112.3(b)]____________3. <br /> 1.4.3 Mobile Facilities [40 CFR§112.3(c)]-------------------------------------------------------------- <br /> 1.4.4 Professional Engineer's Certification [40 CFR§112.3(d)]----------------------------3 <br /> 1.4.5 Plan Availability for Inspection [40 CFR§112.3(e)]_____________________________________3. <br /> 1.4.6 Extension of Time for Plan Provisions [40 CFR§112.3(f)]_________________________ 4 <br /> 1.5 SPCC Plan Amendments [40 CFR§112.4].................................................................4. <br /> 1.5.1 Discharge Reporting Requirement [40 CFR§112.4(a)]---------------------------------4 <br /> 1.5.2 Applicability of Reporting Requirement [40 CFR§112.4(b)]-----------------------4 <br /> 1.5.3 State Agency Notification [40 CFR§112.4(c)]----------------------------------------------- <br /> 1.5.4 SPCC Plan Amendment [40 CFR§112.4(d)]-------------------------------------------------- <br /> 1.5.5 Timeframe for Plan Amendment [40 CFR§112.4(e)]------------------------------------ <br /> 1.5.6 Appeal Decision to Amend Plan [40 CFR§112.4(f)]------------------------------------- <br /> 1.6 SPCC Plan Amendment Triggers [40 CFR§112.5]----------------------------------------------------5 <br /> 1.6.1 Changes in Facility Design, Construction, Operation or Maintenance <br /> [40 CFR§112.5(a)]-------------------------------------------------------------------------------------------5 <br /> 1.6.2 Plan Review and Evaluation Every Five (5) Years [40 CFR§112.5(b)]....... <br /> 1.6.3 Certification of Technical Amendments to Plan [40 CFR§112.5(c)]...........7 <br /> 1.7 Qualified Facilities [40 CFR§112.6]---------------------------------------------------------------------------7. <br />