My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
520
>
2900 - Site Mitigation Program
>
PR0536710
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 10:01:33 PM
Creation date
7/11/2019 4:39:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536710
PE
2950
FACILITY_ID
FA0021089
FACILITY_NAME
VACANT
STREET_NUMBER
520
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906032
CURRENT_STATUS
01
SITE_LOCATION
520 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sol Gas Sampling — PRT System Operation <br /> Sampling <br /> 1. Connect the outer end of the tubing to the Silicone Tubing <br /> Adapter and vacuum hose(or other sampling apparatus). <br /> 2. Follow the appropriate sampling procedure for collecting a <br /> soil gas sample(Figure 1). <br /> Removal <br /> 1. After collecting a sample,disconnect the tubing from the <br /> vacuum hose or sampling system. <br /> 2. Pull up firmly on the tubing until it releases from the r <br /> adapter at the bottom of the hole. (Taped tubing requires a <br /> stronger pull.) <br /> 3. Remove the tubing from the probe rods. Dispose of <br /> polyethylene tubing or decontaminate Teflon tubing as <br /> protocol dictates. <br /> 4. Retrieve the probe rods from the ground and recover the <br /> expendable point holder with the attached PRT adapter. <br /> Figure 1.Taking a soil gas sample <br /> 5. Inspect the O-ring at the base of the PRT adapter to verify for direct injection into a CC with <br /> that proper sealing was achieved during sampling.The O- the PITT system. <br /> ring should be compressed.This seal can be tested by - <br /> capping the open end of the point holder applying vacuum <br /> to the PRT adapter. <br /> 6. Prepare for the next sample. <br /> Geoprobe Systems <br /> :o.:. :. .:.:.:....... : ,' ' -'fJ.:e::q); :.,¢?�::.,..e..o:+'. • ?;•,'. .AF•:":.<.rvq.p:, °•xk; at?.;0,.; •�+F:.y�Oo' i6R':.kla... <br /> DA <br />
The URL can be used to link to this page
Your browser does not support the video tag.