My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WETMORE
>
210
>
2800 - Aboveground Petroleum Storage Program
>
PR0544025
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2019 4:20:12 PM
Creation date
7/11/2019 4:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544025
PE
2832
FACILITY_ID
FA0005481
FACILITY_NAME
MANTECA CORP YARD
STREET_NUMBER
210
Direction
E
STREET_NAME
WETMORE
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21938313
CURRENT_STATUS
01
SITE_LOCATION
210 E WETMORE ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN 10 A Q U I N Environmental Health Department <br /> - COUNTY - <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facil' a � Fa . ' i 1dre �,, ( � Date: , 110 <br /> Qualified Facility - Tier I <br /> 405 CFR 112.6 (a)(3) (iii) Overfill prevention for containers not provided , not described in Plan, or tested ❑ V ❑ R ❑ COS <br /> Qualified Facility = Tier II <br /> 501 CFR 112.6 (a) (1 ) , Tier II Qualified Facility Plan not certified by the owner or a PE , as required ❑ V ❑ R ❑ COS <br /> 112 ,6 (b) <br /> 502 CFR 112.6(b) (2) Tier II Qualified Facility Plan technical amendment not certified by the owner or a PE ❑ V ❑ R ❑ COS <br /> 503 CFR 112.6(b) (3) , Failure to have a PE certify in writing alternative measures for a Tier II Qualified Facility ❑ V ❑ R ❑ COS <br /> 112.6(b) (4) <br /> 504 CFR 112.6 (b) (4) (i) Failure of owner to assure that a PE makes all required attestations in a Tier II Plan ❑ V ❑ R ❑ COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section ❑ V ❑ R ❑ COS <br /> 602 CFR 112.7(a) (2) Plan failed to discuss equivalent environmental protection, if applicable ❑ V ❑ R ❑ COS <br /> 603 CFR 112.7(a) (3) Failed to adequately describe the physical layout of the facility in the Plan ❑ V ❑ R ❑ COS <br /> 604 CFR 112.7(a) (3) (i) Plan failed to include oil type and storage capacity for each container ❑ V ❑ R ❑ COS <br /> 605 CFR 112.7(a)(3) (ii) Plan failed to adequately discuss discharge prevention measures, including routine handling ❑ V ❑ R ❑ COS <br /> 606 CFR 112.7 (a) (3) (iii) Plan failed to adequately discuss facility drainage or drainage controls ❑ V ❑ R ❑ COS <br /> 607 CFR 112.7(a) (3) (iv) Plan failed to include countermeasures for discharge discovery, response and cleanup ❑ V ❑ R ❑ COS <br /> 608 CFR 112.7(a) (3) (v) Plan failed to address disposal methods for recovered materials ❑ V ❑ R ❑ COS <br /> 609 CFR 112.7(a) (3vi) , Plan failed to adequately contain procedures for reporting a discharge ❑ V ❑ R ❑ COS <br /> 112.7(a4) <br /> 610 CFR 1123 (a) (5) Discharge procedures are not adequately addressed if the facility has no response plan ❑ V ❑ R ❑ COS <br /> 611 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalence ❑ V ❑ R ❑ COS <br /> 612 CFR 1123 (c) Plan failed to include secondary containment, diversionary structures , or equip to prevent discharge ❑ V ❑ R ❑ COS <br /> 613 CFR 112.7(c) Failure to provide appropriate secondary containment, diversionary structures or equipment ❑ V ❑ R a COS <br /> 614 CFR 112.7(d) PE certified Plan failed to explain impracticability of containment/diversionary structures ❑ V ❑ R ❑ COS <br /> 615 CFR 112.7(d) Failure to perform integrity and leak testing when claiming secondary containment impracticability ❑ V ❑ R ❑ COS <br /> 616 CFR 112 .7(d) (1 ) Failure to prepare an oil spill contingency plan when claiming impracticability of structures ❑ V ❑ R ❑ COS <br /> 617 CFR 112 .7 (d)(2) No written commitment of manpower, equipment, and materials to control and remove oil discharge ❑ V ❑ R ❑ COS <br /> 618 CFR 112.7 (e) , 112. 8(c) Failed to keep records of procedures, inspections, or integrity tests for three years ❑ V ❑ R ❑ COS <br /> (6) <br /> 619 CFR 112.7(f) (1 ) Failed to train personnel on all discharge prevention details listed in this section &V ❑ R ❑ COS <br /> 620 CFR 112.7(f) (2) Failed to designate a person accountable for discharge prevention ❑ V ❑ R ❑ COS <br /> 621 CFR 112.7(f) (1 ) Failure to include in the SPCC Plan an adequate description of employee training ❑ V ❑ R ❑ COS <br /> 622 CFR 112.7(f) (3) Failure to conduct complete annual discharge prevention briefings for oil-handling personnel aV ❑ R ❑ COS <br /> 623 CFR 112.7(g) Plan failed to address security of site and valves, lock out/tag out, and lighting ❑ V ❑ R ❑ COS <br /> 624 CFR 112 .7(g) Facility failed to implement security of site and valves, lock out/tag out, and lighting ❑ V ❑ R ❑ COS <br /> 625 CFR 112 .7 (h) Plan failed to adequately discuss facility tank car and tank truck loading/unloading rack ❑ V ❑ R ❑ COS <br /> FA0010323 PR0528682 SCO03 06/13/2019 <br /> EHD 28-01 Rev. 09/27/2018 Page 2 of 4 Aboveground Petroleum Storage Act OIR <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468-3420 F 209 464 -0138 1 www. sjcehd . com <br />
The URL can be used to link to this page
Your browser does not support the video tag.